Overview of Status of Analysis, Design, Fabrication, Tests, etc.
2 Modules Completed
Sponsor loved it
Accomplishments from Previous Week
Class is done yay
Report Complete
gg tfp
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Relax/Take time off/Play Video Games with team
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Patent
Block off ABS dissolving method on poster
Trip to Germany
~September
Present to Owner, VP, Senior Engineers
Need approval from Refika
Brutal at Germany
Cost Analysis
Ease of Manufacturing
Ease of Assembly
Include slide on Annealing
More flow in slides
Interest in Short term employment
Contractors
More final/finished product
iPhone: Aluminium body, Glass top, Capacitive buttons
Project oriented, stipend, goal oriented, Tranches
Clean up App, Connectivity
Cover up Housing
Silicone Sealing, toggle/rocker, capacitive boards/breakout
Not so interested in spinning faster
Confident to drop in bath on September meeting
Most compelling is battery-powered module
User Manual/Document
As much info
German Manuals: Extremely detailed
“You can try but you won’t even scratch the surface”
Enough info for the next sponsor team
Connectivity
Flexible
Stacking
Return Project materials to IKA
Label boxes/bags
Wiring diagrams
Do what’s reasonable
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
Risks and Areas of Concern
Resources or Information Required but not Available
Schedule
Budget (list amount spent and amount remaining)
Spent $1,824.36
Remaining $3,175.64
Progress on Report and Webpage
Errata for Report
Webpage updated