The 2026 deployment focuses on implementing the TA-14 Environmental Integrity Framework within selected K–12 classroom environments, establishing a fully operational system capable of continuous measurement, intervention, and verification.
The timeline is structured to move from site selection → baseline establishment → system deployment → validation → performance optimization within the 2026 calendar year.
Objectives:
Identify and confirm participating school site(s)
Define deployment scope (number of classrooms)
Establish stakeholder alignment (administration, facilities, technical team)
Milestones:
Site selection finalized
Deployment plan approved
Data collection framework defined
Equipment and sensor requirements identified
Objectives:
Install non-invasive monitoring systems
Establish Atmospheric Integrity Record (AIR)
Capture baseline environmental and system performance data
Activities:
Environmental sensor deployment
System performance monitoring setup (kW, airflow, thermal indicators)
Initial occupancy mapping
Milestones:
Continuous data collection initiated
Verified baseline conditions established
Initial system performance profile documented
Objectives:
Analyze baseline data
Identify performance gaps and high-risk conditions
Define intervention thresholds
Activities:
Environmental condition analysis
Ventilation and filtration performance assessment
Identification of deviation patterns
Milestones:
Baseline analysis report completed
Performance thresholds defined
Intervention criteria established (NIRET decision framework active)
Objectives:
Execute targeted, performance-triggered interventions
Activities:
Ventilation adjustments
Filtration upgrades or optimization
System calibration and mechanical corrections
Milestones:
Interventions completed across selected classrooms
All actions documented within EIR
System transitions from observation to active control
Objectives:
Validate effectiveness of interventions
Activities:
Continuous environmental monitoring
Comparison of pre- and post-intervention conditions
KPI tracking initiated
Milestones:
Verified improvement in environmental conditions
Reduction in time spent in high-risk conditions documented
KPI baseline established for performance tracking
Objectives:
Refine system performance
Ensure stability and repeatability
Activities:
Ongoing AIR data analysis
Adjustment of system parameters
Continuous KPI tracking
Milestones:
Stable environmental condition compliance achieved
Continuous data coverage established
Energy-to-environment relationships validated (kW ↔ BTU ↔ occupancy)
By the end of 2026, the project will deliver:
A fully operational TA-14 deployment in a real-world school environment
Continuous Atmospheric Integrity Record (AIR) dataset
Documented Environmental Integrity Record (EIR) including all actions and outcomes
Verified baseline and post-intervention performance comparison
Initial KPI performance results
“By the end of 2026, this project will transition from deployment to verified operation, with a fully functional system capable of continuously measuring, documenting, and improving indoor environmental conditions.”