Mitchell Farm Traffic Impact Study TIS (10/21)
Final DelDOT Response to Mitchell TIS is in. See full document below.
Historic postings: What does the Mitchell Farm Traffic Impact Study TIS (September 2019) and the Mitchell Farm TIS Addendum (April 2020) say about the impacts of Mitchell Farm development on Kings Highway? See the documentation obtained under FOIA below. The complete September 2019 TIS document is availble upon request (1,977 pages). The complete April 2020 TIS Addendum is provided here.
The September 2019 TIS lays out the traffic implications of full development of the site by 2027. The TIS Addendum reflects a partial buildout adding two new building to the one existing or 117,000 SF of office space by 2023.
NEW: 3/12/2021 draft DelDOT Response to Mitchell Farm TIS and Addendum: The DelDOT Response reflects traffic analysis and recommendations made by DelDOT Consultant, JMT to mitigate the traffic implications of the Mitchell Farm site development.
2/28/2022 Final DelDOT Response to Mitchell Farm Traffic Study (TIS)
DelDOT Response provides traffic information about the Mitchel project.
10/8/2021 Final DelDOT Response to Mitchell Farm Traffic Study (TIS)
The 10/8/2021 DelDOT Response provides traffic information about the Mitchel project. The document does was produced before the new Mitchell applications.
DRAFT 3/12/2021 DelDOT Response to TIS and to TIS Addendum. 74 pages.
Complete Mitchell Farm Traffic Impact Study Addendum (Interim Plan) April 2020 - 361 Pages
draft Kings Highway Traffic Impact Study (TIS) Executive Summary Only- Full document is 1,977 pages. Available upon request.
DRAFT 9/18/2020 DelDOT Response to TIS and to TIS Addendum. 72 pages.
DRAFT 2/29/2020 DelDOT Response to Mitchell Farm TIS. 68 pages.
draft Kings Highway Traffic Impact Study (TIS) Conclusions extract from September 2019 TIS
draft Kings Highway Traffic Impact Study (TIS) Pages 1969 - 1976 Comments extracted from September 2019 TIS
02052019 Service Level Evaluation: DelDOT letter stating that a Traffic Impact Study (TIS) is required for the Mitchell Farm project.