Gray Cook (co-creator of the Functional Movement Screen) often talks about problems in modern sports systems — including schools, youth sports, and community recreation departments.
While he rarely attacks specific cities, his lectures describe systemic problems in how communities organize sports and recreation.
Below is the FMS philosophy applied to city Parks & Recreation departments.
Most parks departments organize programs like:
Hockey
Baseball
Soccer
Football
Basketball
But Cook argues these are NOT foundational skills.
They are advanced expressions of movement.
He teaches the correct order should be:
Movement → Skills → Sport → Competition
Instead, cities often run:
Sport → Competition → Injuries → Dropout
Result:
Kids specialize too early
Movement problems go undetected
Injury rates rise
Many kids quit sports entirely
Cook often says:
“You can’t put sport skills on top of dysfunctional movement.”
Cities spend millions building:
Ice rinks
Baseball diamonds
Turf fields
Stadiums
But invest almost nothing in teaching movement literacy.
Cook's philosophy:
Buildings don’t develop athletes — movement education does.
A $50M facility without movement development just produces:
Overuse injuries
Early specialization
Burnout
Most youth coaches know:
Plays
Drills
Strategy
But not biomechanics or movement development.
Cook frequently says:
“We have thousands of sport coaches but almost no movement coaches.”
Key missing knowledge:
Stability vs mobility
Trunk control
Fundamental movement patterns
Developmental progressions
Without this foundation:
Kids practice bad movement patterns thousands of times.
Youth sports systems often reward:
Championships
Rankings
Travel teams
Early specialization
Cook warns that this:
Pushes kids too hard too early
Ignores physical development stages
Produces injuries
A properly run system measures success by:
Movement quality
Durability
Long-term participation
Most cities never assess movement quality.
But the FMS system screens for:
Mobility limitations
Stability deficits
Asymmetry
motor control problems
Without screening:
Kids play sports on dysfunctional movement patterns.
That leads to:
Knee injuries
Back pain
Shoulder problems
Ankle issues
Programs would focus on fundamental patterns:
Crawling
Rolling
Squatting
Jumping
Landing
Throwing
Running
NO specialization yet.
Goal:
Build a strong movement foundation.
Add:
Stability training
Coordination drills
Deceleration skills
Trunk control
Sprint mechanics
Screening begins here using FMS.
Only now should kids start specializing.
Training integrates:
Movement quality
Strength
Speed
Skill
Corrective exercises address any dysfunctions.
Sport becomes more competitive.
But movement maintenance continues:
Screening
Recovery
corrective training
This prevents injury and burnout.
Instead of sport-only leagues, departments would run:
Youth movement development
Coordination training
agility and balance
Annual movement assessments
Injury risk identification
Movement science
Development stages
injury prevention
The goal becomes:
Healthy lifelong movers — not just youth champions.
Cook often summarizes the whole philosophy with one rule:
“First move well. Then move often.”
Most recreation systems skip the “move well” part.
Communities that implement movement-first programs often see:
lower injury rates
more kids staying in sports
better athletic performance
healthier adults later in life
Instead of building only facilities, they build human capability.
Below is a practical blueprint for how a Movement-First Parks & Recreation system could work in a city like Bismarck using the philosophy taught by Gray Cook and the Functional Movement Screen.
The idea is simple but powerful:
Cities should develop movers first — athletes second.
Instead of organizing youth recreation around sports leagues, the department would organize programs around movement development stages.
Programs focus on brain + body coordination.
Activities:
crawling
rolling
climbing
balance games
throwing / catching
hopping and landing
rhythm and coordination
Purpose:
develop the nervous system
improve coordination
build confidence in movement
Most U.S. recreation departments skip this stage entirely.
Kids learn the fundamental patterns of human movement.
Core patterns taught:
squat
hinge
push
pull
rotate
run
jump
land
crawl
Programs might be called:
• Youth Movement Academy
• Move Better Bismarck
• Foundations of Athletic Movement
Sports are introduced lightly, but not specialized.
This stage begins screening and corrective work.
Kids learn:
deceleration
cutting mechanics
trunk stability
balance under speed
landing safely
Movement screening could be done using the FMS system.
Kids who have:
ankle restrictions
hip limitations
trunk instability
get corrective programs early before injuries appear.
Now athletes train:
strength
speed
agility
sport skill
But movement maintenance continues.
This dramatically reduces:
ACL injuries
back pain
shoulder injuries
burnout
Most parks departments look like this:
Current Model
Sports Division
hockey
baseball
soccer
basketball
football
Everything revolves around leagues and tournaments.
The foundation of the system.
Programs:
preschool movement
youth coordination
crawling / rolling development
balance and agility
youth strength foundations
This division should reach thousands of kids per year.
Every youth athlete in the city could receive:
annual movement screens
corrective exercise guidance
injury risk identification
Cities rarely offer this, but it is inexpensive and extremely valuable.
Local coaches would receive training in:
movement literacy
trunk stability
mobility development
youth strength principles
long-term athlete development
Cities currently rely on volunteer coaches with little training.
Sports leagues would still exist:
hockey
soccer
baseball
basketball
track
But athletes would enter leagues after movement foundations.
If Bismarck built a $200M complex, it could include something almost no city in America has:
Instead of just fields and rinks, the complex would include a Movement Science Wing.
Features:
FMS assessments
gait analysis
jump mechanics
mobility testing
Used by:
youth athletes
high school teams
adult fitness programs
Specialized equipment:
crawling lanes
climbing structures
balance beams
landing platforms
agility systems
Designed for movement development, not just sport drills.
Indoor training for:
acceleration
deceleration
change of direction
Key for:
football
soccer
track
hockey
basketball
Focused on:
anti-rotation training
crawling patterns
dead bug progressions
bird dog patterns
This is the core of injury prevention.
National-level certification programs in:
movement literacy
youth athletic development
injury prevention
Bismarck could become a regional education hub.
Most cities build facilities.
Very few build movement development systems.
If done right, Bismarck could become known for:
youth athletic development
injury prevention leadership
movement education
Similar to how cities become known for:
Olympic training centers
elite academies
sports medicine institutes
A national movement center could attract:
coaching conferences
youth training camps
sports science seminars
regional tournaments
This creates:
hotel stays
tourism
national visibility
All while improving local health and youth sports quality.
The entire system follows one rule taught by Gray Cook:
Move well → Move often → Move skillfully → Move powerfully
Most systems start at the last step.
Below is a realistic strategy for turning a $200M Movement-Focused Sports Complex into a real project in Bismarck.
This combines politics, funding, facility design, and persuasion strategy for the Bismarck Parks and Recreation District.
Large public projects in Bismarck typically move through four stages.
Before government approval, you must create visible community demand.
Actions:
• Present the movement-first concept to youth sports groups
• Meet with school administrators
• Present at youth coaching meetings
• Publish a community health and injury report
Key message:
“Bismarck needs a youth movement and injury prevention center, not just more fields.”
If parents and coaches support the concept, political approval becomes much easier.
The next step is convincing the Bismarck Parks and Recreation District to commission a feasibility study.
The study evaluates:
population growth
sports demand
economic impact
facility needs
construction cost
Cost of study:
$100k–$500k
Most large projects start here.
For a project this large you need cooperation from:
• Bismarck City Commission
• Park District Board
• State legislators in North Dakota
Their role:
land approval
infrastructure
funding mechanisms
Major public projects typically combine multiple funding sources.
A $200M project would likely require 4–6 funding streams.
A realistic funding stack could look like this:
Funding Source
Estimated Amount
State grants
$40M
Bakken oil revenue
$40M
City bonds
$50M
Private donations
$30M
Corporate sponsorship
$20M
Tourism/hotel tax
$20M
Total = $200M
North Dakota has large oil tax revenues from the Bakken Formation.
These funds often go into the North Dakota Legacy Fund.
The North Dakota Legislative Assembly occasionally allocates funds to:
infrastructure
community projects
economic development
Pitch idea:
“National Youth Movement & Sports Development Center.”
If framed as statewide athletic development, funding becomes much more likely.
Many complexes receive donations from:
• local business leaders
• healthcare systems
• energy companies
Naming rights examples:
Performance center sponsor
Indoor arena sponsor
Movement center sponsor
Large donors often give $5M–$20M.
4
The Movement Center would be the most unique part of the complex.
Typical size:
80,000 – 120,000 square feet
Equipment:
crawling tracks
climbing structures
balance beams
soft landing zones
obstacle courses
Purpose:
Develop movement literacy for ages 3–10.
Features:
60-meter sprint lanes
deceleration training zones
turf agility grids
Used by:
football
soccer
track
hockey
Technology:
motion capture cameras
force plates
jump analysis
movement screens
Used by:
youth athletes
high schools
rehabilitation programs
Focus:
anti-rotation training
crawling progressions
kettlebell training
sled pushes
medicine ball work
Inspired by concepts taught by Gray Cook.
Purpose:
Host training for:
youth coaches
PE teachers
athletic trainers
Could host regional conferences.
Programs for adults:
mobility training
injury prevention
aging movement programs
This greatly increases community usage.
The key mistake most people make:
They pitch facilities instead of outcomes.
The Park Board wants:
participation
economic impact
community health
Your argument should focus on these.
Research shows:
youth sports injuries are rising
overuse injuries are common
early specialization increases injury risk
Movement development reduces these problems.
A national-level complex attracts:
tournaments
training camps
coaching conferences
Hotels, restaurants, and tourism benefit.
Bismarck’s metro population continues to grow.
Large facilities are needed to support:
youth leagues
regional tournaments
recreation demand
Very few cities have movement development centers.
Bismarck could become known nationally for:
youth athletic development
injury prevention
movement education
If you want this idea to actually happen, the first move is simple:
Create a 10–15 page concept proposal titled:
“Bismarck National Movement & Sports Development Complex.”
Include:
concept drawings
economic impact
youth development benefits
funding ideas
Present it to:
• Park Board
• City Commission
• local legislators
Here is a real-world political map and strategy for getting a $200M Movement & Sports Complex approved in Bismarck.
Large park projects succeed when you understand who actually decides, how proposals move, and what examples convince them.
These are the positions (and current leaders where known) that typically determine whether a large recreation project moves forward.
The Bismarck Parks and Recreation District is governed by five elected commissioners who set policy and approve major projects.
1️⃣ Mark Zimmerman
Board President – sets meeting agendas and leads major initiatives.
2️⃣ Julie Jeske
Oversees facilities and programs portfolio.
3️⃣ Michael Gilbertson
Operations portfolio commissioner.
4️⃣ Kate Herzog
Former business executive and downtown development leader.
5️⃣ Paula Redmann
Former park district community relations manager.
These five people ultimately vote on large park district capital projects.
6️⃣ Kevin Klipfel
Runs day-to-day operations and capital planning.
In reality:
If the executive director supports a project, it is far more likely to pass.
Large projects also require cooperation with the City of Bismarck.
Important roles:
7️⃣ Mayor of Bismarck
8️⃣ Bismarck City Commissioners
9️⃣ City Engineer / Planning Department
These officials control:
roads
utilities
zoning
land approvals
10️⃣ Leadership from the Bismarck-Mandan Convention and Visitors Bureau
Tourism boards influence projects that attract tournaments and visitors.
When tourism groups support a sports complex, projects move much faster.
Most citizen proposals fail because they skip the normal park planning process.
Successful projects follow this sequence:
Title example:
“Bismarck National Movement & Youth Sports Development Complex”
Contents:
Problem statement
Population growth trends
Youth sports demand
Injury prevention benefits
Economic impact estimate
Concept facility layout
Preliminary cost estimate
Goal:
Convince the board to authorize a feasibility study.
Typical cost:
$150k–$500k
Study analyzes:
demand
tourism potential
construction cost
economic impact
operating model
Almost every large sports complex begins with this step.
The project must be included in the Park District long-term capital plan.
This includes:
land acquisition
transportation access
utility planning
Park boards rarely fund projects alone.
A typical funding package includes:
city bonds
state grants
tourism taxes
private donations
sponsorship
Projects become politically easy when:
youth sports groups support them
parents show up to meetings
economic benefits are clear
These are extremely useful when convincing politicians, because they show similar projects already exist.
Cost: $280 million
Features:
320 acres
158 fields and courts
indoor arena
large event lawn
championship pickleball stadium
This complex hosts regional tournaments and major events.
Cost: $211 million
Includes:
athletic performance center
Olympic track
multiple turf fields
water park
event venues
City officials called it a “legacy project” for future generations.
Cost: $1 billion total development
Features:
170,000 sq-ft indoor sports center
multiple baseball diamonds
volleyball courts
wakeboarding lake
hotels and restaurants
One of the largest youth sports destinations in the U.S.
Cost: $150 million
Includes:
soccer fields
basketball courts
tennis
education and learning facilities
Funded mostly through philanthropic donations.
Politicians usually approve sports complexes for three reasons:
Youth tournaments bring:
hotel stays
restaurants
retail spending
Facilities attract:
families
youth programs
regional competitions
Cities increasingly frame recreation as public health infrastructure.
Instead of saying:
“Build a sports complex.”
The winning pitch is:
“Build the Midwest’s first Youth Movement Development Center and Tournament Complex.”
That narrative combines:
health
economic development
sports tourism
Below is a realistic land strategy for building a 120-acre sports complex in Bismarck.
The key reality: large complexes almost always go on the edge of the city, not in the center.
A regional sports complex usually requires:
Feature
Acres
Indoor facility (100–200k sq ft)
5–8
Parking
25–35
Outdoor fields
40–60
Future expansion
20–40
Road access + buffers
10–15
Total:
100–150 acres
For context, General Sibley Park covers about 138 acres, which shows the scale of land required.
4
Location:
north of the city along Highway 83
near Costco / Hay Creek retail growth
Why this area works:
fastest residential growth
highway access
utilities expanding
Large development land already exists nearby, including 30+ acre commercial parcels near N. 19th Street, showing the area is actively expanding.
A sports complex here could anchor:
hotels
restaurants
retail
This is how most tournament complexes develop.
4
Example parcel:
120 acres near 80th St NE east of Bismarck.
Why this area works:
large undeveloped farmland
cheaper land
room for expansion
Downside:
farther from hotels
may require road upgrades
But many large complexes start exactly this way.
Another example currently listed:
143 acres on 110th Ave NE north of Bismarck.
Advantages:
already large enough
agricultural land easier to convert
close enough to city infrastructure
This size parcel is almost perfect for a 120-acre sports campus.
Typical 120-acre sports complex layout:
Highway Access
│
▼
Hotels / Restaurants
│
Main Entrance Boulevard
│
Indoor Sports & Movement Center
(120,000 sq ft)
Parking Fields
(2,500–3,000 spaces)
Outdoor Fields Zone
• 6 turf fields
• 4 baseball/softball diamonds
• track & field complex
Future Expansion Zone
• indoor arena
• hotel
• training academy
The most successful complexes are built like mini sports districts.
These mistakes happen in almost every city.
Bad pitch:
“We need more sports fields.”
Good pitch:
“This project brings regional tournaments and tourism.”
Cities approve projects that:
bring visitors
grow tax revenue
create economic activity
A complex must attract:
regional tournaments
youth championships
travel teams
Without that, politicians see it as just another local park.
Real costs include:
road expansion
sewer
water
parking
lighting
Infrastructure can add $20M–$40M to a project.
If these costs appear later, projects collapse politically.
Sports complexes must cover:
staffing
maintenance
turf replacement
utilities
Most successful complexes include:
tournaments
memberships
training programs
Successful projects usually have a major partner like:
hospital system
sports academy
university
national training organization
This creates credibility.
The most politically effective pitch would be:
“Bismarck Regional Youth Sports & Movement Development Complex.”
Key outcomes:
• Midwest youth tournament destination
• national youth movement training center
• economic driver for hotels and tourism
• injury prevention hub for North Dakota athletes
That narrative combines sports, health, and economic development.
Here’s a practical, research‑based breakdown you can use for planning a large complex in Bismarck — including specific parcels big enough for ~120 acres, how similar facilities in Fargo and Sioux Falls were funded (lessons you can use), and a guide for sketching your master plan without requiring proprietary mapping tools.
These are existing land listings in the Burleigh County/Bismarck area that either meet or closely approach the target acreage.
Agriculture land ~143 acres — big enough for a full 120‑acre sports campus.
Close to Highway 83 and city limits — easier infrastructure access.
Approximately 160 acres — adequate room for facilities, outdoor fields, parking, and expansion.
Around 108 acres north of the city, directly on a major corridor offering strong visibility and access.
There currently aren’t many separate listings above ~30 acres near town limits, but:
You can aggregate multiple parcels in growth corridors (e.g., along State Highway 83 or 110th Ave NE)
Combined smaller parcels on the edge of city limits could reach ~120 acres with zoning change and coordinated land acquisition — common strategy in large development planning.
Large agricultural tracts north and northeast of Bismarck (currently not listed) are often privately owned but could be targeted for pre‑development negotiations or future city land sales.
These regional examples are especially valuable because they show how to structure public/private funding and political strategy — lessons Bismarck stakeholders can adopt.
Funding & Partnerships:
Built on 123 acres in south Fargo as a destination indoor and outdoor athletic facility.
The project received millions in private donations plus significant in‑kind contributions from major regional partners — notably Sanford Health.
Private fundraisers and foundation support helped secure ~$34M, with in‑kind gifts adding to the total.
Political Lessons:
Early private financial commitment before board votes builds confidence that the project isn’t just a taxpayer burden.
Aligning with health and community partners helped the Parks District justify the investment.
Though smaller than the $200M scale, Sioux Falls offers strong lessons:
Funding Model:
A large multi‑field sports complex and indoor arenas were supported by private investment from Sanford Health combined with community support.
Economic Impact Strategy:
The complex’s planners and sponsors emphasized regional tourism and youth development benefits — not just local rec leagues.
Takeaway for Bismarck:
✔ Large regional health systems or universities can act as anchor donors.
✔ Framing complex benefits in terms of jobs, tourism, and kids’ health outcomes increases political support.
Below is a textual “site plan” you can turn into diagrams with planners/architects (required for feasibility and funding proposals):
West Side
│
│ Hotel + Retail Zone (conference space, restaurants)
│ ───────────────────────
│ Entry Plaza + Visitor Center
│
│ Main Public Parking (2,500+ spaces)
│
│ Indoor Athletic Pod
│ • 120,000–200,000 SF multi‑sport indoor facility
│ • Turf fields, courts, running track
│ • Flex exhibition halls / event space
│
│ Movement & Training Center
│ • Movement labs
│ • Speed/agility hall
│ • Trunk stability zone
│ • Coach education classrooms
│
│ Parent / Spectator Lounges
│ • Cafés
│ • Viewing decks / childcare
│
│ Outdoor Competition Zone
│ • 6–8 multi‑use turf fields
│ • 4 baseball/softball diamonds
│ • Track & field spaces
│ • Lighting + bleachers
│
│ Future Expansion Parcel (south or east)
│ • Additional courts
│ • Hotel expansion
│ • Sports medicine clinics
│
East Side
│
Infrastructure access via major roads
Launch surveys & focus groups
Partner with youth sports orgs and health systems
Present economic impact studies early
Commission a feasibility study
Secure anchor donation commitments before public votes
Explore tax increment financing (TIF), lodging tax pledges, and state grants
Approach health systems (like Sanford), universities, or private donors
Offer naming rights for major facilities
Emphasize regional tourism impact (major tournaments + annual events)
✔ There ARE parcels already listed that meet or approach the acreage requirement (e.g., ~143 acres on 110th Ave NE) that could form the nucleus of a sports campus.
✔ Combining public funding with private partners increases feasibility and political acceptance (Fargo and Sioux Falls models show this).
✔ A strong master plan narrative that integrates indoor facilities, outdoor fields, and future expansion — along with economic impact data — is critical to winning approval.
Let’s create a visual-ready site plan diagram and a draft feasibility study outline for a $200M Bismarck sports campus. This is designed to be presentable to the Park Board, City Commission, and potential donors.
Concept: A 120–150 acre “Movement + Sports Complex” integrating indoor, outdoor, and support facilities.
Description for designer or image generation:
Layout: Rectangular 120–150 acre site, oriented with major highway on the west side for access.
Zones:
West Side – Entry & Hospitality
Hotels, conference center, restaurants, visitor plaza.
Main entrance boulevard leading to parking and facilities.
Central Indoor Athletic Pod
Multi-sport indoor facility (~120,000–200,000 SF)
Turf fields, basketball courts, indoor track, flex exhibition hall.
Movement & Training Center
FMS-based labs, speed/agility hall, trunk stability zone, coach classrooms.
Parent / spectator lounges overlooking training zones.
Outdoor Competition Zone
6–8 multi-use turf fields
4 baseball/softball diamonds
Track & field zones
Lighting and bleachers
Future Expansion Area
Additional indoor/outdoor fields
Additional hotel or sports medicine clinics
Parking: Centralized, 2,500–3,000 spaces near main facilities.
Roads & Circulation: Entry boulevard from highway, internal loop roads separating indoor/outdoor areas.
Color Key:
Blue: Indoor facility & training center
Green: Outdoor fields
Gray: Parking & roads
Yellow: Hotels / visitor services
Orange: Future expansion
This diagram can be generated as a clean, professional schematic with labels for Park Board presentations.
This is a structured proposal for the Park Board to approve a $200M complex.
Project name: Bismarck Regional Youth Movement & Sports Complex
Project size: 120–150 acres
Total cost: $200M
Key outcomes: youth development, injury prevention, regional tournaments, economic impact
Population growth trends in Bismarck metro
Youth sports demand & participation rates
Current recreation limitations
National trend toward movement-first sports complexes
Target catchment area (50–150 miles)
Regional youth sports tournaments demand
Competing facilities (Fargo, Sioux Falls, Minneapolis-St. Paul)
Tourism & hotel occupancy impact
Top parcels evaluated:
110th Ave NE (~143 acres)
97th Ave NE (~160 acres)
Highway 83 north (~108 acres)
4–5. Combined smaller parcels in north Bismarck growth corridor
Evaluation criteria: acreage, access, utility availability, expansion potential, cost
Indoor athletic pod: multi-use courts, turf fields, indoor track
Movement & training center: FMS labs, speed/agility hall, trunk stability zones
Outdoor fields: multi-use fields, baseball/softball, track & field
Hospitality: hotels, restaurants, conference space
Parking & circulation: 2,500–3,000 spaces, internal loop roads
Future expansion zones
Estimated construction cost: $200M
Funding sources:
State grants: $40M
Bakken oil fund: $40M
City bonds: $50M
Private donations: $30M
Corporate sponsorship: $20M
Lodging/tourism tax: $20M
Operational costs & revenue projections
Economic impact: jobs, hotel stays, tourism, regional tournaments
Park District oversight
Facility management team
Partnerships with health systems, schools, universities
Youth and adult program integration
Construction risks
Infrastructure and utility costs
Political and community support
Operating cost overruns
Mitigation strategies
Feasibility study: 6–9 months
Land acquisition: 3–6 months
Design & permitting: 12–18 months
Construction: 24–36 months
Grand opening: 4–5 years from start
Approve feasibility study
Begin preliminary land negotiations
Launch community support campaign
Initiate anchor partnerships with private donors and health institutions
Site Size: 120–150 acres
Orientation: North at top, Highway 83 / major road on the west side for access.
Color Code Legend:
Blue: Indoor Athletic Facility & Movement Center
Green: Outdoor Fields & Competition Zones
Yellow: Hotels / Restaurants / Visitor Amenities
Gray: Parking & Roads / Circulation
Orange: Future Expansion / Growth Areas
NORTH
┌───────────────────────┐
│ │
│ Future Expansion │ Orange
│ (additional fields, │
│ indoor arena, hotel) │
│ │
└─────────┬─────────────┘
│
│
Outdoor Competition Zone (Green)
┌─────────────────────────────┐
│ │
│ 6–8 Multi-use Turf Fields │
│ 4 Baseball / Softball │
│ Track & Field Zones │
│ Bleachers + Lighting │
└─────────┬─────────────┘
│
│ Internal Loop Road (Gray)
│
Indoor Athletic Pod & Movement Center (Blue)
┌─────────────────────────────┐
│ Multi-use Indoor Courts │
│ Turf Fields / Indoor Track │
│ FMS Labs / Speed & Agility │
│ Trunk Stability Training │
│ Coach Education Classrooms │
│ Parent / Spectator Lounges │
└─────────┬─────────────┘
│
│ Main Internal Roads / Circulation (Gray)
│
Hotels / Restaurants / Visitor Plaza (Yellow)
┌─────────────────────────────┐
│ Hotels / Conference Center │
│ Restaurants / Cafés │
│ Visitor Entry Plaza │
└─────────┬─────────────┘
│
│ Main Entrance Boulevard (Gray)
│ Highway 83 / Primary Access
Centralized parking (2,500–3,000 spaces), near indoor facility and visitor services.
Loop road separates indoor and outdoor zones for safe traffic flow.
Entry boulevard from highway with roundabout for visitor drop-offs.
Multi-use courts for basketball, volleyball, futsal
Turf fields for indoor soccer, lacrosse, field hockey
Indoor running track (40–60m straight lanes, optional circular track)
FMS labs: motion capture, jump/landing analysis, movement screening
Speed/Agility Hall: sprint lanes, deceleration zones, change-of-direction drills
Trunk Stability Training: anti-rotation, bird dog, dead bug, crawling patterns
Coach Education: classrooms, seminar space
Parent / Spectator Lounges overlooking main training areas
6–8 multi-use turf fields for soccer, lacrosse, flag football
4 baseball / softball diamonds
Track & field area for sprints, jumps, throws
Bleachers & shaded seating for spectators
Field lighting for evening tournaments
2–3 mid-size hotels for tournament teams and visitors
Conference / banquet facility for meetings and events
Cafés and restaurants with outdoor seating
Visitor plaza / ceremonial entry space
Additional indoor arena for training or exhibition events
Extra fields (turf or grass) for tournament overflow
Sports medicine & rehab clinics
Possible hotel expansion
Movement-first philosophy integrated into indoor training center.
Separation of circulation and activity zones for safety and efficiency.
Room for expansion to accommodate future growth or new sports.
Tourism-friendly layout: hotels and conference spaces at the entrance.
FMS labs and coach education: positions Bismarck as a regional leader.
The Bismarck School District could implement many of the “movement-first” principles directly in PE classes, but there are some important caveats and limitations compared with a full $200M sports complex. Let me break it down:
Incorporate Functional Movement Screen (FMS) principles into PE:
Crawling, rolling, hopping, balancing
Anti-rotation/core stability drills (bird dog, dead bug variations)
Sprint, change-of-direction, agility drills
Use small equipment: cones, mini hurdles, resistance bands, medicine balls
Teach kids trunk control, anti-rotation, and basic core strength
Integrate progressions instead of sit-ups (Gray Cook method)
Could help prevent common youth sports injuries without heavy weightlifting or specialized gyms
Train PE teachers on movement assessment and corrective exercises
Use classroom or small gym space to run FMS screenings
Optional: teacher workshops, parent handouts
Incorporate movement literacy into recess, after-school programs, or even classroom brain breaks
Example: “Movement Stations” instead of standard running laps
Factor
Limitation in Schools
Advantage of a Dedicated Complex
Space
Gymnasiums are small, limited outdoor fields
Multiple full-size fields, indoor multi-sport turf, speed/agility lanes
Equipment
Limited to cones, balls, resistance bands
Full FMS labs, motion capture, sprint lanes, sleds, medicine balls
Specialization
Teachers may not have deep FMS knowledge
Coaches, trainers, and labs dedicated to youth movement
Frequency
1–3 PE classes per week
Daily access to movement programming, year-round
Scale
Individual school impact
City-wide regional hub attracting tournaments, clinics, and community programs
A cost-effective approach could be:
Integrate FMS principles into PE curriculum immediately:
PE teachers implement crawling, hopping, balance, trunk stability
Use low-cost equipment
Train teachers via workshops
Partner with a regional movement center:
Students can occasionally attend clinics or “movement days” in a specialized facility (like the proposed complex)
Track outcomes:
Reduced injuries
Improved movement competency
Better athletic performance in school sports
This hybrid approach improves youth movement city-wide while building the case for a full-scale $200M complex later.
Here’s a Bismarck School District “Movement-First PE Curriculum” outline that integrates FMS principles across all grades — a practical roadmap for improving movement literacy, trunk stability, and injury prevention city-wide.
Goal: Develop a foundation of functional movement, trunk control, agility, and overall athleticism in students of all ages, aligned with Gray Cook’s FMS principles.
Grade
Focus
Key Activities
Equipment Needed
K–2 (Ages 5–7)
Fundamental Movement & Play
Crawling, rolling, hopping, balance beams, basic jumping, basic anti-rotation games
Cones, mats, low balance beams, hoops
3–5 (Ages 8–10)
Movement Literacy
Advanced crawling/rolling patterns, hopping & landing mechanics, partner resistance drills, crawling “obstacle circuits”
Mats, cones, agility ladders, resistance bands
6–8 (Ages 11–13)
Trunk Stability & Coordination
Bird dog, dead bug progressions, anti-rotation holds, medicine ball toss, dynamic balance drills
Mats, medicine balls, resistance bands, mini hurdles
9–12 (Ages 14–18)
Functional Athletic Training
Movement screening, sport-specific movement patterns, sprint/change-of-direction mechanics, loaded carries, partner drills, trunk stability under load
Turf areas, medicine balls, agility ladders, cones, small sleds, light weights
Frequency: 2–3 PE classes per week, 45–60 minutes
Segment
Duration
Activity Examples
Warm-Up (5–10 min)
5–10 min
Dynamic movement patterns, crawling, skipping, hip mobility drills
Skill Development (15–20 min)
15–20 min
Agility, coordination, trunk stability exercises, hopping/landing mechanics
Movement Circuits (15–20 min)
15–20 min
Multi-station FMS circuits: balance beams, medicine ball toss, lateral hops, partner anti-rotation drills
Cool-Down / Reflection (5 min)
5 min
Stretching, discussion on movement quality and safe mechanics
Screenings: Annual Functional Movement Screen (FMS) for grades 6–12 to track development
Goals: Identify movement deficiencies early, reduce risk of sport injuries, provide corrective exercises
Teacher Training: All PE teachers trained in FMS principles to recognize compensation patterns and guide corrective movements
Workshops: FMS certification or local workshops for PE teachers
Coaching Clinics: Seasonal trainings for sport coaches in trunk control, anti-rotation, and movement prep
Parent Engagement: Handouts and short videos demonstrating corrective exercises for home practice
Mats, cones, agility ladders, mini hurdles
Resistance bands & light medicine balls
Balance beams or low platforms
Optional: small sleds or weighted balls for upper-grade training
After-School Clubs: “Movement Lab” or “Trunk Stability Club”
Sports Teams: Pre-season movement screenings and corrective sessions
Classroom Brain Breaks: Short crawling, hopping, or trunk activation exercises during academic classes
Improved movement competency across all students
Reduction in sport-related injuries in middle/high school athletics
Measurable gains in agility, balance, trunk control, and coordination
Establish a city-wide culture of movement literacy, which can feed into the proposed sports complex in the future
✅ Next Step Suggestion: Create a visual “Movement-First PE Curriculum Poster” for the district showing K–12 progression, key FMS exercises, and trunk/stability development milestones. This could parallel the sports complex poster to visually link schools and city-wide initiatives.