VOLUNTEERS - HOMEOFFICE

App Location Names & Conventions

Naming conventions and tips for naming our FWC field locations and features

App V3 Location Naming - Conventions

Our default FWC creek naming convention abbreviations are captured in the list below:

  • Bridge - BRDG

  • Creek - Ck

  • Culvert (Corrugated Metal Pipe) - CMP

  • Drive - Dr

  • Downstream - D/S

  • Lake - Lk

  • Point - Pt

  • Road - Rd

  • Downstream - D/S

  • Upstream - U/S

  • ...

The above "standard" abbreviations are used in our site location name definition, to ensure consistency and ease of use in field data manipulation etc.

Our regular freshwater catalogue field site names have an established, four-digit, watershed code site prefix indicating the watershed with a memorable code. Ideally, these codes should be available for all our our island watershed field sites, for example for Fulford Creek (FLCK) and 2112 ( remains as 2112 as we have no watershed names available for a large number of "direct - storm" island watersheds).

More information on Watershed Codes in use in the FWC will shortly be available in our ""FWC field “processed” data, compilation & interpretation guidelines"".

Limiting FWC Field Location Naming Along Creeks - A Rule of Thumb

With certain FWC "local detail" project exceptions, we try and minimise the number of named field locations per creek to those needed to be ”representative of a creek” and/or a watershed, otherwise charting (and other data management stuff) become a real head-ache. This often means sampling a creek system near its coastal outfall, particularly if a watershed's creek systems are "funnelled" into one system at the coast. Remember the project is about island-wide watershed - surface flow and chemistry analysis (kind of "regional"), though we investigate doing "local detail" data collection, if and where we have volunteers, or where these additional local insights may add value in informing developing surface-groundwater models and in planning around these.

Note - the exception to this "limit the number of names/locations" rule-of-thumb is if there was/is a specific purpose for the changes in naming, associated with investigations along a creek - eg measuring a profile along a creek (creek continuity, along-stream aquatic system health, chemistry variability etc).