New Norman Neighborhood Bulletin Board:
TGW Infrastructure Improvement Construction to begin!!  
Below is the estimated schedule:
  • Hayward Rd: Oct. 16, 2017
  • Skyward Tank Foundation: October 2017
  • Well Drilling Oct-Nov 2017*
  • Robideaux Rd: November 2017
  • Norman/Valencia Backyard water line: Nov. 2017-Jan. 2018
  • 1380/1335 Trout Gulch to 125 Skyward Dr: February 2018
  • 125-385 Skyward Dr. (green tank area): March/April 2018
  • 385-685 Skyward Dr: May 2018
  • 685-925 Skyward Dr: May 2018
  • 925-975 Skyward Dr: June 2018
*Please see the below memo for more details:
__________________________________________________
TGW has closed the USDA Loan on 9/21/17 and held the Preconstruction meeting on 9/26/17!!
TGW is paying off 3 existing loans and will soon begin the construction on the Infrastructure Improvements Project!!
_____________________________________________________________________
OLD FARM LANE EAST CLOSURE from Wed. 8/30/17-Tues. 9/5/17:  TGW will be closing East Old Farm Lane for final construction.  Please use the west entrance /exit during this time.
_______________________________________________________________________

 

9th Annual Members Meeting Presentation
____________________________________________________

Tues. 5/1/17-Fri. 5/26/17: TGW will be making an emergency connection at Trout Gulch Rd. and Old Farm Lane in order to serve water to the lower Trout Gulch Families who have been affected by the Valencia Road Closure.  Old Farm Lane residence, please use the west entrance/exit. 

____________________________________________________
A 2 inch bypass waterline has been installed at the Valencia Road Closure in case the road collapses and breaks the 6 inch watermain in the road.  Be safe, stay out of road closure!!
_____________________________________________________________________________________________________________________________________________________________
FEBRUARY 2017: TGW is finalizing contractors & loan documents for the Phase 2 USDA Infrastructure project!!
_____________________________________________________
WATER SHUT OFF TUESDAY 2/7/17 FROM 8am-4pm for
155-175 Valencia Rd. & 675-920 Trout Gulch Rd.
TGW will be making preventative repairs to the water line in the Valencia Road Closure.
_____________________________________________________
 TGW'S NEW BULLETIN BOARD!!

______________________________________________________
2/9/16: New Drop Box located at the gate of 90 Victoria Lane!!


TGW 5 Year Anniversary Accomplishments Slideshow!!

TGW 5 YEAR PHOTOS-A

 


 
9 YEAR MANGANESE WAIVER VOTE RESULTS: 115YES / 4NO
The California State Title 22 allows for acceptance of Mn levels up to 150 PPB with the consent of those receiving the water. A simple majority vote is required to issue a treatment waiver for 9 years. TGW has 186 members. A simple majority is 93 votes.  TGW has requested the waiver from the county and are awaitng their response. The Managenese chart is posted on the Water Quality Report page. 
!
 
METER INSTALLATION PROJECT
TGW is at 95% completion of the Meter Installation Project! 
Note: All new meter installation will be converted to meter billing at the same time on July 1, 2012Remaining members with more difficult installations will be changed over to the ready to serve rate proportional to estimated water usage until meter is able to be installed.
 
LOWER VALENCIA PROJECT COMPLETED!
All upgrades have been completed on Lower Valencia extension now has a 4inch main and wharfhead!