WJEC Engineering Unit 2
Producing Engineering Products
Producing Engineering Products
Unit 2 concerns students making an engineered item. They will be given an set of drawings which they need to;
Interpret
Plan for make
Manufacture
Evaluate
There are 12 hours given to assessing this unit, broken down into the following stages;
Interpret and Plan - 2hrs
Manufacture - 9 hrs
Evaluate - 1hr
Evidence is a minimum of 6 sides of A3, max of 7.
Learning before the assessment will comprise of small projects (steel tray, plumb-bob) designed to cover a wide range of processes from sheet metal to turning. Our assessed piece is a desk lamp.
A presentation from the exam board can be found here. A considerable amount of information to assist students towards a good grade can be found.