Guidelines for Weekly Progress Reports
Weekly Progress Reports (see sidebar), the Gantt chart, and this Project Management page should be printed out before meetings with the sponsor and instructor.
All team members should be able to explain all items on the progress report.
Place a "*" at the beginning of the title of the active week Progress Report (see * in sidebar).
Overview of Project Context
Dr. Frank Talke and Anay Pandit have been working together for the last few months to develop a better disposable endoscope after the recent outbreak of infections at UCLA.
Project Objectives
High Priority Objectives
Make the endoscope disposable and created with a 3-D printer
As a result of being disposable, the endoscope should be cheap
Since the endoscope will be interacting with the human body, it should be biocompatible as well
Second Priority Objectives
Easy to assemble
Customizable to different patients’ organs
Durability for an entire procedure
Other Constraints and Issues
Critical angles
Endoscope must be hollow in order to account for camera
Risk Reduction Objectives
After speaking with Anay, he mentioned that our first order of business should purely be design. We have discussed spending at least the first three weeks thinking about design. Ideally, he wanted us to come up with a design different from his, and eventually come to a consensus on which combination of our designs would be best. The focus of the design should be the critical angle mentioned in the sigmoid of the colon that has a radius of 25.8 mm.
Intermediate Milestones
Our intermediate milestones are to finish designing, manufacturing, and testing every 5 weeks respectively, so that by the 15 week period, our project is finalized. We understand that some parts may take longer or shorter than others as well as leak into each other, but maintaining that relative timeline will keep us on track to finish on time.
Individual Component Analysis Topics
The individual components of Anay’s design are the ABS joints, the thermal expansion wires, the miniature linkages, the bendable end, and the hand control. However, the analysis of these parts should come with the formulation of our own ideas.
Weekly Meeting Time with sponsor:
We will be meeting with our sponsor on Friday at 2 pm.