Milestone 14

Dropbox Subassembly Design Update

Subassembly Breakdown

Due to the finalized clutch selection made in Milestone 13, the reduction housing a subassembly had to under go a redesign in order better locate the driveshaft and engine for operator comfort and safety.  The new dropbox design utilizes all of the same internals as outlined in Milestone 5; however, the housing will be a 3-piece, CNC-machined, aluminum housing. The housing has been designed to be an improvement in serviceability, manufacturability, and aesthetics when compared to the droboxes utilized on past Wildcat pulling tractors. A new transaxle bulkhead was also designed to fit the new housing, and a custom gasket will also be made for this subassembly.

Assembly Drawing

EXPLODED VIEW

REFERENCE DIMENSIONS

BOM

Manufacturing Drawings

Dropbox Front Cover

Dropbox Center

Dropbox Back

Dropbox Gasket

Transaxle Bulkhead

Previous         Next