Milestone 14
Dropbox Subassembly Design Update
Dropbox Subassembly Design Update
Subassembly Breakdown
Subassembly Breakdown
Due to the finalized clutch selection made in Milestone 13, the reduction housing a subassembly had to under go a redesign in order better locate the driveshaft and engine for operator comfort and safety. The new dropbox design utilizes all of the same internals as outlined in Milestone 5; however, the housing will be a 3-piece, CNC-machined, aluminum housing. The housing has been designed to be an improvement in serviceability, manufacturability, and aesthetics when compared to the droboxes utilized on past Wildcat pulling tractors. A new transaxle bulkhead was also designed to fit the new housing, and a custom gasket will also be made for this subassembly.
Assembly Drawing
Assembly Drawing
EXPLODED VIEW
EXPLODED VIEW
REFERENCE DIMENSIONS
REFERENCE DIMENSIONS
BOM
BOM
Manufacturing Drawings
Manufacturing Drawings
Dropbox Front Cover
Dropbox Front Cover
Dropbox Center
Dropbox Center
Dropbox Back
Dropbox Back
Dropbox Gasket
Dropbox Gasket
Transaxle Bulkhead
Transaxle Bulkhead