The Pelican Cap of Maria Woeltzerin
And yes, there is a closeup.
Yes..... it is under construction.
Yes..... it is under construction.
Portrait by: Hans Maler zu Schwaz (1490–1530) Maria Welzer von Eberstein
Portrait by: Hans Maler zu Schwaz (1490–1530) Maria Welzer von Eberstein
Also known as: Hans Maler, Maler von Ulm Maler von Ulm, Johan Maler zu Schwaz
Also known as: Hans Maler, Maler von Ulm Maler von Ulm, Johan Maler zu Schwaz
Date of birth: 1474
Date of birth: 1474
Date of death: 1535
Date of death: 1535
The following is a photographic detail on the composition of this project. I determined that I was extremely lucky that I had worked in the Beaded Art Doll Group where I learned the process on working with a 3D fiber form and the the beading techniques from working on multiple Beaded Art Dolls. One aspect of clarification will be relating a 1 dimensional painting to a 3 dimensional product. The visual implications and construction implications will be a challenge but as I discussed with a member of the Order of the Laurel
The following is a photographic detail on the composition of this project. I determined that I was extremely lucky that I had worked in the Beaded Art Doll Group where I learned the process on working with a 3D fiber form and the the beading techniques from working on multiple Beaded Art Dolls. One aspect of clarification will be relating a 1 dimensional painting to a 3 dimensional product. The visual implications and construction implications will be a challenge but as I discussed with a member of the Order of the Laurel
The techniques will be reviewed with assumptions of construction during the
Template for (1) Baby Pelican
Template for (1) Baby Pelican
Kingdom of Atlantia Twelfth Night - 7th January 2023
Kingdom of Atlantia Twelfth Night - 7th January 2023
The Cap was not completed due to being Reservations and Gate Minister for the Event. I still elected to Display the piece even though it is not done and this is the response.
The Cap was not completed due to being Reservations and Gate Minister for the Event. I still elected to Display the piece even though it is not done and this is the response.
The Pelican Cap in progress
The Pelican Cap in progress
As of 10/27/23- the cap is now under construction. After doing a Project X analysis I have determined that with use of stablizers I will be able to keep the Pelican secure on the cap as shown in the painting. Let us finish this project. Three babies and a cap with brim.
As of 10/27/23- the cap is now under construction. After doing a Project X analysis I have determined that with use of stablizers I will be able to keep the Pelican secure on the cap as shown in the painting. Let us finish this project. Three babies and a cap with brim.