IceBridge 2015 Arctic Deployment
First Processing Day 5/26/15 6 month deadline 11/26/15
VectorNAV was installed BACKWARDS after 4/30/2015
ATM T5- stable operation- clean at low altitude. at high altitude shows oscillation consistent with 68 Hz aircraft vibrations.
ATM T3 - gradual scanner loosening and coming apart. repaired in field.
ATM parameters (approximate): T5 nadang 2.379 deg, heading 180deg; T3 nadang 14.34deg, heading 180deg.