The chassis is needed before I can power up and test the preamp. The chassis is in fab and delivery is expected in about 10 days. I also designed and ordered a cab from
Kendrick Amps. They're making a custom "short" Bassman cab with two baffles - 1x12 and 12+10. Now it gets real as all the planning, design, and waiting shifts to assembly, test, and tweaking with actual hardware. This is gonna be fun.