The Risk Matrix brings together your system's Risk Consequences, Likelihoods, and Types to allow colour coding of your Project Risks.
The screen is structured as follows:
The drop-downs shown at each point of the matrix show a list of your Risk Types. The matrix is updated as soon as the Risk Type is changed.