V5.03 released

Post date: Sep,01 2019 10:28:00 AM

After a slightly longer-than-planned delay I have finally released v5. Much of the delay is down to the usual tale of life intruding on the route. The other delayer has been the length of time it now takes to do any sort of scenario work due to the silly size of the route.

The route can be downloaded from UKTS or from the files page on this site. Please check the v5 install requirements on the files page - especially relevant if you haven't downloaded any of the previous versions.

The release of v5.00 takes the line from up to York. There is more work to be done at several of the major stations (Doncaster, Selby and York) but I hope that I have done enough to give a reasonable feel for how the route would have looked.

I have made an attempt at both of York's roundhouses - RH2 (roofless by the BR period) needs re-doing, RH3 is slightly better but far from perfect.

I have made a rough start on scenery on the lines from Peterborough East to Ely via March. These are WIP - my hope is to complete the rest of the 'country' sections for v6.00 (aka 'the final release'...)