PH1020951.236 [2] [2A] Saltash. City Centre. Plymstock. Mount Batten [2B]

07 September 2015

PH1020951/236STAGECOACH DEVON LTD[2 2A], Royal Parade, , Mount BattenReceived: 10-Jul-2015Effective: 07-Sep-2015Accepted: 10-Jul-2015Variation:0. N & P:  2534, 3.1 Registration of new services Daily service upto 20 mins Mon-Sat and hourly on Sundays and Bank Holidays on each serviceNew Registration: 
PH1020951/236STAGECOACH DEVON LTD[2 2A], Royal Parade, , Mount BattenReceived: 24-Jul-2015Effective: 06-Sep-2015Accepted: 24-Jul-2015Variation:1. N & P:  2536, 3.4 Applications to Vary Existing Services Granted Under Short Notice 
To extend service from Royal Parade to Saltash,. To correct start date"Route and timetable amended: Existing first route 2 is extended to form a cross-City link to Saltash, incorporating route 1/1AThe start date for the extension to Saltash may be delayed until 20 September subject to a decision by the Traffic Commissioner, but the service to Mount Batten will commence from 6 SeptemberAdditional early morning and later evening journeys to Mount Batten introducedOreston will no longer be served. Route 2 will serve Pomphlett Close as now, whilst new route 2A will serve Pomphlett Road and Dene Cross Road."

01 May 2016

PH1020951/236STAGECOACH DEVON LTD[2 2A], Saltash, , Mount BattenReceived: 04-Mar-2016Effective: 01-May-2016Accepted: 04-Mar-2016Variation:2. N & P:  2551, 3.3 Applications to Vary Existing Services To revise route in St Stephens. To revise timetable"to amend route & timetable: The 2/2A service route is changing in both Plymstock and Saltash.Service 2 buses will continue onto Mount Batten every 20 minutes using the current route.The 2A will now serve Elburton every 20 minutes via a new loop along Springfield Road and Stanborough Road.In Saltash, and in response to customer feedback, the 2 will serve Frobisher Drive instead of Beatrice Avenue"

28 July 2016

PH1020951/236STAGECOACH DEVON LTD[2 2A], Saltash, , Mount BattenReceived: 21-Jul-2016Effective: 28-Jul-2016Accepted: 21-Jul-2016Variation:3. N & P:  2561, 3.4 Applications to Vary Existing Services Granted Under Short Notice Request by Plymouth city council to operate a later journey at 2320 from Royal Parade to both Saltash and Mount Batten for the MTV Crashes event on 28/29 July and for the British Fireworks Championships on 16/17 August - and at similar periods each year.to amend route & timetable: 

12 March 2017

PH1020951/236STAGECOACH DEVON LTD[2 2A], Saltash, , Mount BattenReceived: 10-Feb-2017Effective: 12-Mar-2017Accepted: 13-Feb-2017Variation:4. N & P:  2583, 3.4 Applications to Vary Existing Services Granted Under Short Notice To reivise timetable to improve reliabilityto amend timetable: 

28 JUL 2017

Licence: PH1020951.288Operator: STAGECOACH DEVON LTDAddress: Matford Park Depot, Stagecoach South West, Matford Park Road, Exeter, EX2 8FD, GBRoute Number: 2F (2)Start Point: Royal ParadeVia: 0End Point: Mount BattenOther Details: Request by Plymouth City Council to operate a later journey at 2320 from Royal Parade to Mount Batten for the MTV Crashes event on 27/28 July and for the British Fireworks Championships on 9/10 August - and at similar periods each year.Received: 20-Jul-17Effective: 27-Jul-17Accepted: 23-Aug-17End Date: 00-Jan-00Event Type: RegisteredN & P: 2610b: Registration of New Services Granted Under Short Notice (3.2)Initial Published: DT070Final Published: DT070Request by Plymouth City Council to operate a later journey at 2320 from Royal Parade to Mount Batten for the MTV Crashes event on 27/28 July and for the British Fireworks Championships on 9/10 August - and at similar periods each year.

03 September 2017

PH1020951/236STAGECOACH DEVON LTD[2 2A 2B], Saltash, , Mount BattenReceived: 08-Jul-2017Effective: 03-Sep-2017Accepted: 11-Jul-2017Variation:5. N & P:  2604, 3.3 Applications to Vary Existing Services To revise route & timetable
[2 2A 2B], Saltash, , Mount BattenReceived: 17-Jul-2017Effective: 03-Sep-2017Accepted: 23-Aug-2017Variation:6. N & P:  2610, 3.4 Applications to Vary Existing Services Granted Under Short Notice To revise route & timetableFrom 3 September we are making changes to our Plymouth bus services, the first significant revamp of our services since we took over a number of routes from First Devon & Cornwall in September 2015. More buses between Elburton, Plymstock and City CentreNew service between Royal Parade and Mount BattenIn Plymstock, there will be buses up to every 5 minutes to the city centre. Mount Batten will have a new service – the 2B – which will run up to every 20 minutes between Royal Parade and Mount Batten. Both the 2 and 2A will run to Elburton which doubles the frequency to this part of the City and gives more cross-city connections to Plymouth Station, St Budeaux and Saltash

27 October 2017

Route branding on 37139

18 February 2018

18 February 2018PH1020951/236STAGECOACH DEVON LTD[2 2A], Saltash, Mount BattenReceived: 22-Dec-2017Effective: 18-Feb-2018Accepted: 02-Jan-2018Variation:72628: 3.3 Applications to Vary Existing ServicesTimetable: 

"Comments: From 18 February 2018, and following our customer consultation, we are making revisions to our 2/2A timetable. Customer feedback strongly favoured reintroducing the link between Mount Batten, the city centre, railway station and Saltash. Therefore, the 2B will be combined back into the main timetable to provide a through service.We are also introducing extra resource to help improve reliability, including an additional journey from Saltash during the morning rush hour.Buses will run every 10 minutes between Saltash and Plymstock, and every 20 minutes to Elburton and Hooe / Mount Batten."

09 September 2018

PH1020951/236STAGECOACH DEVON LTD[2 2A], Saltash, Mount Batten or SherfordReceived: 15-Aug-2018Effective: 09-Sep-2018Accepted: 06-Sep-2018Variation:8NP2664: 3.4 Applications to Vary Existing Services Granted Under Short Notice"Comments: ""Sherford will soon be getting its first bus service following a review of the city’s subsidised network. Launching in September, the 2A will be operated by Stagecoach South West and link the new community in the east with Saltash in the west, via Plymstock Broadway, Pomphlett Roundabout, the city centre, railway station and Milehouse. It will run every 20 minutes during the day from Monday to Saturday and hourly in the evenings, on Sundays and on Bank Holidays.""The information above comes from Plymouth City Council. Stagecoach themselves don’t mention it at all on their web site even though they have modified route branding on some of their buses!"

27 October 2019

PH1020951/236STAGECOACH DEVON LTD[2 2A], Saltash, Mount Batten or SherfordReceived: 18-Sep-2019Effective: 27-Oct-2019Accepted: 18-Sep-2019Variation:10NP2718: 3.4 Applications to Vary Existing Services Granted Under Short NoticeTimetable: Comments: Services 2/2A slightly amended timetable on Saturday mornings

30 March 2020

PH1020951/236STAGECOACH DEVON LTD[2 2A], Saltash, Mount Batten or SherfordReceived: 26-Mar-2020Effective: 30-Mar-2020Accepted: 22-Apr-2020Variation:11NP2749: 3.4 Applications to Vary Existing Services Granted Under Short NoticeTimetable: Comments: 

12 MAY 2020

Licence: PH1020951.236COVID19 NOT on DVSA

14 JUN 2020

Licence: PH1020951.236COVID19 NOT on DVSA
No changes have been registered under PH1020951.236 but there have been registrations PH1020951.288/289 Route 2 Latchbrook 2 • St Stephens 2A • Saltash • St Budeaux • Milehouse • Plymouth Railway Station • Plymouth City Centre • Pomphlett • Plymstock • Elburton 2A • Sherford 2A • Mount Batten 2 A new timetable will be introduced to uplift the current emergency timetable to a higher frequency.

03 January 2021

PH1020951/236, STAGECOACH DEVON LTD, MATFORD PARK ROAD, MATFORD PARK DEPOT, EXETER, EX2 8FD, GB[2 2A], Saltash, , Mount Batten or SherfordReceived: 24-Dec-2020Effective: 03-Jan-2021Variation:12. N & P:  NP2786, 3.4 Applications to Vary Existing Services Granted Under Short Notice Reverting to Pre-covid timetable with alterations of timing points+ School journeys 

05 September 2021

PH1020951/236, STAGECOACH DEVON LTD[2 2A], Saltash, , Mount Batten or SherfordReceived: 23-Jul-2021Effective: 05-Sep-2021Accepted: 27-Aug-2021Variation:13. N & P:  NP2819, 3.3 Applications to Vary Existing Services (T001342)Change of timing point

10 October 2021

PH1020951/236, STAGECOACH DEVON LTD[2 2A], Saltash, , Mount Batten or SherfordReceived: 08-Oct-2021Effective: 10-Oct-2021Accepted: 08-Nov-2021Variation:14. N & P:  NP2830, 3.4 Applications to Vary Existing Services Granted Under Short Notice (T001544)Temporary reduction of service owed to acute PCV driver shortage

24 April 2022

PH1020951/236, STAGECOACH DEVON LTD[2 (2A)], Saltash, , Mount Batten or SherfordReceived: 07-Mar-2022Effective: 24-Apr-2022Accepted: 24-Mar-2022Variation:15. ,  Timetable variation - new timetable from 1st April on Traveline

04 September 2022

PH1020951/236STAGECOACH DEVON LTD[2 2A], Saltash, Mount Batten or SherfordReceived: 09-Aug-2022Effective: 04-Sep-2022Accepted: 05-Sep-2022Variation:16NP2872: 3.4 Applications to Vary Existing Services Granted Under Short NoticeTimetable: T001942Comments: While the route and frequency of buses remains unchanged, there are minor changes to the timetable, customers should check the new timetable before travelling.

02 April 2023

PH1020951.236STAGECOACH DEVON LTD[2 (2A)], Saltash, Frith Street, Plymouth, Royal Parade & Mount BattenReceived: 28-Feb-2023Effective: 02-Apr-2023Accepted: 15-Mar-2023Variation:17
Punctuality changes to timings on timetable, and amendments to some service times.  The removal of the afternoon Saltash School cover bus, from Wearde Road , Saltash to Royal Parade, as this is now covered by a service bus at the same times.  The 2A will be revised to operate between the City Centre and Saltash ONLY ( Replaced with the 1A  service to Sherford )Timetable: T002362"Service 2 will continue to operate every 30 minutes Monday to Saturday daytime and every 60 minutes in the evening and on Sunday and Public Holidays between Mount Batten and Saltash via City Centre.
Service 2A will be revised to operate between the City Centre and Saltash only, operating every 30 minutes Monday to Saturday daytime and every 60 minutes during the evening and on Sunday and Public Holidays. The current section of route between Sherford and the City Centre will be served by new Service 1A, which will provide an enhanced level of service."

03 September 2023

PH1020951.236STAGECOACH DEVON LTD[2 (2A)], Saltash, Plymouth City Centre, Mount BattenEffective: 03-Sep-2023Variation:19Variation AcceptedNP2920: 3.3 Applications to Vary Existing ServicesPunctuality changes to timings on timetable, and amendments to some service times.  The 2A now interworks with the GOLD service. Some early morning and evening services withdrawn.. The timetable is revised on all days of operation to improve punctuality of the service. Along the common section of route, the revised timetable will offer a better coordination of departures between Services 2 and 2A. There is a slight reduction to the number of journeys on Service 2A on Saturday mornings and daily evening journeys after approximately 1900 will be withdrawn due to low passenger demand. Service 2 will continue to operate every 60 minutes throughout the evening.Record updated: 27 August 2023

07 January 2024

PH1020951.236STAGECOACH DEVON LTD[2 2A], Saltash, Plymouth City centre, Mount BattenEffective: 07-Jan-2024Variation:20Variation Accepted by SNNP2938: 3.4 Applications to Vary Existing Services Granted Under Short Notice
Record updated: 16 December 2023
To divert the 2 route along Callington Road and Church Road in Saltash, following changes to current road layout by Highways. No changes to timetables apart from Timing point changed to Church Road / Cornwall College. The diversion route along Callington Road and Church Road in Saltash will become the permanent route following passenger feedback

26 May 2024

PH1020951.236STAGECOACH DEVON LTD[2 2A], Saltash, Plymouth City Centre, Mount BattenEffective: 26-May-2024Variation:21Variation Accepted by SNNP2959: 3.4 Applications to Vary Existing Services Granted Under Short Notice
Within Plymstock, between Dean Hill and Pomphlett Road, buses will now operate a more direct route via Dean Cross Road and the full length of Pomphlett Road.Plymstock Road, Randwick Park Road, Foresters Road, Pomphlett Close and Pomphlett Gardens will now be served by Service 1A.The frequency of buses Monday to Saturday daytime between approximately 0700 and 1900 will be increased from every 30 minutes to every 20 minutes, providing an additional journey opportunity every hour.On Sunday and Public Holidays daytimes the frequency of buses will be doubled from hourly to every 30 minutes, buses will also serve more of Saltash, covering the routes of both Services 2 and 2A.Times are also revised each day buses operate to improve reliability and punctuality.
Service 2A (Saltash to City Centre)Times are revised each day buses operate to improve reliability and punctuality.The Sunday and Public Holiday timetable will be withdrawn, however, the frequency of Service 2 will be doubled and the route of Service 2 amended to take in the Service 2A route around Saltash."Record updated: 18 May 2024