Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Finalized frame design and placed orders for frame components.
Created an initial electrical circuit design.
Accomplishments from Previous Week
3D Printed solenoid holders.
Created a way to control a 10 Amp motor shield using a potentiometer.
Finalized frame design and placed orders for frame components.
Created an initial electrical circuit design.
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Begin fabricating the frame (Everbrook and John).
Finalize and test circuit design (Joe and Tanner).
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Not applicable for this week.
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Discussed challenges that the team was facing with increasing magnitude of magnetism (1/14/21 over Zoom).
Increase current supplied to solenoids.
Increase number of coils.
Look at different types of cores.
Discussed 3D printing methods and pricing with Chris Cassidy (1/14/21 over Zoom).
Chris Cassidy recommended asking for a spool winder from Steve Roberts (1/14/21 over Zoom).
Instructional team discussed frame design and tolerancing with the team (1/14/21 over Zoom).
Met with Steve to discuss circuit design (1/15/21 over Zoom).
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
Not applicable for this week.
Risks and Areas of Concern
Failure in electrical circuit (e.g. driver burnout, short circuit, etc.).
Electric discharge
Strong magnetic fields
Improperly constrained Helmholtz coils could harm bystanders if they fall off the test bench.
Project budget is relatively small so team needs to use resources efficiently.
Resources or Information Required but not Available
Schedule
Describe upcoming milestone
Update Gantt chart.
Budget (list amount spent and amount remaining)
Team has used $237.29 which leaves a budget of $262.71 remaining.
Progress on Report and Webpage
Updated webpage weekly report and budget.
Updated internal team pages.