Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Finalizing frame design after updating and improving our MATLAB simulation for magnetic field density.
Accomplishments from Previous Week
Created an application that makes it easier to modify system parameters and visualize results.
Tesla meter was received and has been used to conduct experimentation on the team's existing solenoids.
Simulations without iron core appear to be pretty accurate.
Simulations utilizing the iron cores appear to be flawed.
Created two new frame design variants since last week. Discussed the pros and cons as a team and chose design aspects that were most advantageous to the project's goals.
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Meet with Steve Roberts on Friday (1/15/21) to discuss improvements and safety precautions to the team's design. (Entire Team)
Conduct more research and testing to determine feasible magnetic field density of electromagnet.
Create alternate solenoid designs.
Update frame design to improve structural stability.
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Liked the application developed for interacting with the simulation (1/13/21 over zoom).
Minimize solenoid width to maximize working area (1/13/21 over zoom).
Mentioned that current may be too small to produce an appreciable amount of magnetic field density (1/13/21 over zoom).
Meeting with Steve Roberts on Friday 1/15/21 to discuss solutions to this problem.
Team does not need to purchase a power supply if one is available to be borrowed (1/13/21 over zoom).
Cai group has power supplies available for after the project is completed that are not available to be borrowed in the meantime.
Sponsor liked the team's updated design using T bars but raised concerns over properly securing the iron core (1/13/21 over zoom).
Sponsor said that it is alright if the frame costs a couple hundred dollars (1/13/21 over zoom).
Include additional slots on the base plate to make the design more reconfigurable (1/13/21 over zoom).
Recommended using abacus to test stress concentrations (1/13/21 over zoom).
Sponsor said that is alright if the team goes over budget by a little (1/13/21 over zoom).
Sponsor said that the team's print design would not be an issue if the team decides to utilize that design (1/13/21 over zoom).
Sponsor confirmed that it is alright if the controller is on the outside of the frame (1/13/21 over zoom).
Sponsor said that John's frame design is more complex than Everbrook's but that John's design is more stable (1/13/21 over zoom).
Sponsor wants the project to remain three dimensional (1/13/21 over zoom).
Sponsor wants the final project to have 5% homogeneity but 20% homogeneity is acceptable (1/13/21 over zoom).
Sponsor said that radial homogeneity is not as important as axial homogeneity (1/13/21 over zoom).
Sponsor emphasized the importance of a modular frame design so that the working space can be adjustable (1/13/21 over zoom).
Sponsor says that it is alright if we don't conduct the Comsol simulations but that it would be helpful if the team does the simulations (1/13/21 over zoom).
Sponsor said that it is alright if we do not achieve 1 Tesla but that we should still aim for producing 1 Tesla (1/13/21 over zoom).
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Team discussed gaining access to materials and manufacturing techniques with the instructional team (1/7/21 over zoom).
Spoke with Tom about meeting with him to discuss manufacturing feasibility (1/7/21 over zoom).
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
Not applicable for this week.
Risks and Areas of Concern
Electric discharge
Strong magnetic fields
Improperly constrained Helmholtz coils could harm bystanders if they fall off the test bench.
Project budget is relatively small so team needs to use resources efficiently.
Resources or Information Required but not Available
Schedule
Describe upcoming milestone
Update Gantt chart.
Budget (list amount spent and amount remaining)
Team has used $130.49 of their original budget which leaves $369.51 of budget remaining.
Progress on Report and Webpage
Updated webpage weekly report and budget.