MAE 156B Week 4 Progress Report
Project Title: Locomotion Monitoring System for Mouse Cognitive Behavioral Task
Sponsor Name: Bloodgood Lab and Hnasko Lab
Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Python programs and shell scripts will be used to gather position data
Blower will be used to lift disk
Bending tests done on disk
Lickometer will use IR break beam
Decided on acrylic for material of walls
Accomplishments from Previous Week
Tested lifting capacity of air hockey table
Top plate deflection analysis performed
Extracted position data from optical mouse using raspberry pi
Ordered samples of linear bearings
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Finish design of lickometer and liquid reward delivery system (Philip)
Finalize design for Bloodgood and Hnasko air chamber designs (Michal)
Finalize disk design, follow up with finding suitable laser cutter, start CAD for gasket, applicable standards section of report (David)
Determine resolution of optical mouse encoder, purchase monitor and optical mouse (Jeff)
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments
Sponsors gave us more information on the reward apparatus
Hnasko lab specified that they wanted a 15” monitor for visual cues
Suitable computer monitor was found
Instructor Comments from Last Meeting and Actions Taken to Address these Comments
Air chamber is ok if pressure is below 0.5 psi
Lab Compressed Dry Air (CDA) may not have sufficient flow rate for our purposes
Power source switched from compressed air line to blower
Risks and Areas of Concern
Disk needs to be very rigid yet also light
Weight of air chamber for Bloodgood lab will make it hard to transport
Accuracy and precision of lickometer has yet to be proven
Resources or Information Required but not Available
Communication protocol from raspberry pi and host computer
3’ by 3’ laser cutter would reduce manufacturing time if it was available
Budget (list amount spent and amount remaining)
$318.38 spent thus far
$3,181.62 remaining
Progress on Report and Web Page
Report:
Added “Impact on Society” section
Schedule
Major Milestones: