Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Completed Project Definition worksheet.
Brainstormed ideas for Risk Reduction rapid prototyping.
Decided on 3 different rapid prototype tests to complete for Risk Reduction.
Chose components for Individual Component Analysis.
Met with Fall/Winter 156B to see progress on gauge holder design.
Accomplishments from Previous Week
Met with sponsor at company site.
Met with Instructor to review plans for Risk Reduction and overview of project.
Brainstormed ideas for offloading mechanism.
Set up team webpage.
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Purchase materials necessary to begin rapid prototyping.Â
Rollers (Elaine)
Material for "boat" prototype (Justin)
Low friction material (Desi)
Material for railing prototype (Ethan)
Begin rapid prototyping process - detailed design sketches and/or CAD models.
Roller track design w/ both individual stands and "boat" (Elaine, Justin)
Low friction track with railings (Desi, Ethan)
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments
Comment: You will need to work closely with the current team as you will be polishing their design and integrating with it.
Action: Met the team and have been maintaining close contact.
Instructor Comments from Last Meeting and Actions Taken to Address these Comments
Comment: Choose one area to focus on for Risk Reduction.
Action: Chose to focus on the offloading mechanism.
Comment: Do not focus on verifying the work of the Fall/Winter 156B team.
Action: Met with the team to check in on progress of the stand design as that directly effects the offloading mechanism.
Risks and Areas of Concern (i.e. show stoppers)
Component of process completed by Fall/Winter 156 team not working fully and consistently.
The sponsor plans to fully replace the current manual system and would have no backup if the automated system is not working.
Resources or Information Required but not Available
Schedule
Week 10: Meeting with Instructor
Finals Week: Individual Component Analysis Due
Finals Week: Risk Reduction Presentation
Budget (list amount spent and amount remaining)
Amount spent: $0
Amount remaining: $10,000
Progress on Report and Webpage
Webpage was set up.
Team page completed.
Project management and Week 9 updates completed.