Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Chose tests to perform for rapid prototyping and risk reduction of the off-loading system.
Began individual component analysis of: conveyor rollers, low friction materials, optical sensors, and linear actuators.
Purchased materials for rapid prototyping to begin physical build for Risk Reduction tests.
Accomplishments from Previous Week
Purchased T-slot to create a table frame for Risk Reduction. Table frame will be used with rollers and with low friction material. Frame can be flat or tilted to various angles.
Created CAD designs of roller conveyor table, low friction table, guide rails for table, and "boat" to hold 5 gauge holder stands.
Connected with progress of previous group.
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Build table frame for testing (all)
Testing of different off-loading systems on Thursday (all)
Roller table - varying roller spacing and table angle (Elaine, Ethan)
Low friction table - varying material and table angle (Desi, Ethan)
5-gauge "boat" - testing off-loading vs. single stand (test with rollers & with low-friction (Justin)
Finish individual component analysis (all)
Rollers (Elaine)
Low-friction material (Desi)
Optics sensors (Ethan)
PLC (Justin)
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
N/A
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
No meeting with instructor during Week 9.
Last meeting with instructor was during Week 8 - see Week 9 notes for comments.
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
N/A
Risks and Areas of Concern
Will the holder tip over for various risk reduction tests?
Resources or Information Required but not Available
N/A
Schedule
This Thursday: Testing at sponsor location
Next Monday: Individual Component Analysis reports due
Next Tuesday: Risk Reduction Presentation
Gantt chart: https://docs.google.com/spreadsheets/d/1gE1X4hTutIMDyIw0vMivSkcDjkUueuQxZT0f3DQGiXw/edit?usp=sharingÂ
Budget (list amount spent and amount remaining)
Amount Spent: $800
Amount Remaining: $9200
Progress on Report and Webpage
Started working on Home page.
Updated internal page with contact details.
Updated main project management page with objectives.