Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Can read data from the IMU
Packaging is a work in progress - almost there
Wiring is in progress
Accomplishments from Previous Week
Can read data from the IMU
The pwm board now works
Motor and ESC wires have been cut and soldered
A spreadsheet to track buoyancy has been made and mass measurements have been taken
Ducts and the X-mount were reworked to get to the right buoyancy
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Sam:
Finish the final buoyancy solution
Work with Janelle on packaging/wiring
Matt:
Re-size the tube
Assemble new battery bay
Continue working on drivers
Steve:
Continue work on the camera
Conduct Hyrophone test
Janelle:
Complete wiring
Rearrange proto-board so the pwm board doesn't overhang
All:
straight-line test
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Comment: look into using a hemispheric dome for the camera-may relax the size constraint if you can find one.
Result we found one but it's for a 4" tube and the design is too far along to switch from a 3" ID to a 4" ID. Here it is: https://www.bluerobotics.com/store/watertight-enclosures/wte4-asm-r1/#configuration
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Comment: You're on track for an A, but you can blow it with the report
We won't blow it.
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
Wow, that looks cool
Wow, that looks ugly
Risks and Areas of Concern
What could go wrong?
Resources or Information Required but not Available
We got this.
Schedule
Next Week:
Straight line test
Tweak components to get to the final mechanical design
Update Gantt chart Here: https://docs.google.com/spreadsheets/d/1T9f8QqgFpOAlexk3_7_bvZPCjwls06H0xiEhNaZfJvo/edit#gid=0
Budget (list amount spent and amount remaining)
Spent: $1028.13
Remaining: $ 1471.13
Progress on Report and Webpage
Completed Week 7 update