Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Optics Design: In Progress
Verified alignment of objectives using objective rotation mechanism
Testing of halogen lamp for brightfield
TIRF Testing: In Progress
Continued performing tests to determine appropriate angle, distance, intensity configurations for optimum imaging performance
Spectroscopy: In Progress
Determine dimensions of apparatus
Completed wiring of line CCD circuit
Program to read appropriate data off line CCD in progress
Sent inquiry to vendor that manufacturers spectrophotometer arduino shields
Assessing whether feasible within time frame of class (spectroscopy is secondary objective)
Electronics: In Progress
Possible electronics design:
Implementation of transistor for device power management
Implementation of USB hub
Mechanical: In Progress
Testing:
Implementation of compression springs to keep lead screw engaged
Completed first design of slide tray
Software: In Progress
Development of UI in Java
Development of high resolution image capture
Accomplishments from Previous Week
Completed coding for objective rotation mechanism
Successful operation of objective rotation mechanism
Verified alignment of objective configurations
Completed CAD model of first design of slide tray
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Draft of presentation poster (Kyle, Leo, Reggie, Sean)
Final Draft of Report (Kyle, Leo, Reggie, Sean)
Slide tray fabrication (Kyle, Leo)
Final Draft of Website (Reggie)
Complete testing/design of Spectrophotometer (Reggie, Sean)
Complete testing for determination of fluorescence dimensions (Reggie, Sean)
Fabrication of outer box (Kyle, Leo)
Purchase electronic components for final prototype (Sean)
Purchase hardware components for final prototype (Kyle, Leo)
Rewiring of electronics using new components (Sean, Leo)
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Comments from 5/23/12 Meeting:
Liked recent image captures from brightfield using new objective rotation mechanism
Would like UI to be implemented with iPad
Would like to take prototype to Mozambique
Plans for possible manufacture of product in future
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Comments from 5/17/12 Meeting:
Good hardware progress
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
N/A
Risks and Areas of Concern
Properly reading data of line CCD (for spectrophotometer)
TIRF Lighting Issues
Requires more testing
Resources or Information Required but not Available
Spectrophotometer Arduino shield
Sent purchase inquiry to vendor
5MP USB CMOS Sensor
Achieved contact with vendor
Awaiting confirmation of order and shipment
Schedule
Completion of Final Prototype
Testing of Prototype Performance
Budget (list amount spent and amount remaining)
Amount Spent: $988.02
Amount Remaining: $511.98
Progress on Report and Webpage
Second draft of Webpage In Progress
Second draft of Report In Progress
Uploaded Content onto Multimedia Page