Waterford Pond
Home
Project Overview
Team Members
Fall Milestones
Visit the Pond
Hydrologic/Erosion Analysis
Brainstorm Short-term Solutions
Brainstorm Long-term Solutions
Proposal of Solution
Get Approval From Dr. Edwards
Create Design Package
Meeting With Clients
Final Design
Spring Milestones
Trash-Collecting Boom
Boom Permitting
Purchase Spreadsheet
Pump Screens
Dredging
Stream Design
Survey
Conceptual Design
Cost
Neighborhood Feedback
Design Packages
Fall Design Package
Spring As-Built Design Package
December Results
Spring Test Results
Final Report
Waterford Pond
Home
Project Overview
Team Members
Fall Milestones
Visit the Pond
Hydrologic/Erosion Analysis
Brainstorm Short-term Solutions
Brainstorm Long-term Solutions
Proposal of Solution
Get Approval From Dr. Edwards
Create Design Package
Meeting With Clients
Final Design
Spring Milestones
Trash-Collecting Boom
Boom Permitting
Purchase Spreadsheet
Pump Screens
Dredging
Stream Design
Survey
Conceptual Design
Cost
Neighborhood Feedback
Design Packages
Fall Design Package
Spring As-Built Design Package
December Results
Spring Test Results
Final Report
More
Home
Project Overview
Team Members
Fall Milestones
Visit the Pond
Hydrologic/Erosion Analysis
Brainstorm Short-term Solutions
Brainstorm Long-term Solutions
Proposal of Solution
Get Approval From Dr. Edwards
Create Design Package
Meeting With Clients
Final Design
Spring Milestones
Trash-Collecting Boom
Boom Permitting
Purchase Spreadsheet
Pump Screens
Dredging
Stream Design
Survey
Conceptual Design
Cost
Neighborhood Feedback
Design Packages
Fall Design Package
Spring As-Built Design Package
December Results
Spring Test Results
Final Report
Fall Design Package
Final Design Package Materials:
SECTION A:
Shop drawings for the construction of a trash collector for the incoming stream and screens to protect the pump intakes in the pond.
SECTION B:
Cost Estimate For The components Of The Trash Collector And Pump Intake Screens.
SECTION C:
GIS shapefile with water and sludge/sediment depths at different points in the pond.
SECTION D:
Hydrologic analysis, including estimates for amounts of incoming sediment.
PLAN FOR THE SPRING SEMESTER:
Timetable for implementation of the trash collector into the mouth of the stream.
How the performance of the trash collector will be measured.
Timetable for implementation of the pump screens into the pond.
How the performance of the pump screens will be measured.
Dredging Package for the Neighborhood to consider.
Stream Restoration Package for the Neighborhood to consider.
Plan to provide the Waterford Neighborhood community an opportunity to view the packages for the stream restoration and dredging options.
The Final Combined Design Package:
FinalCombinedDesignPackage.pdf