Fall Design Package
Final Design Package Materials:
Final Design Package Materials:
SECTION A:
- Shop drawings for the construction of a trash collector for the incoming stream and screens to protect the pump intakes in the pond.
SECTION B:
- Cost Estimate For The components Of The Trash Collector And Pump Intake Screens.
SECTION C:
- GIS shapefile with water and sludge/sediment depths at different points in the pond.
SECTION D:
- Hydrologic analysis, including estimates for amounts of incoming sediment.
PLAN FOR THE SPRING SEMESTER:
- Timetable for implementation of the trash collector into the mouth of the stream.
- How the performance of the trash collector will be measured.
- Timetable for implementation of the pump screens into the pond.
- How the performance of the pump screens will be measured.
- Dredging Package for the Neighborhood to consider.
- Stream Restoration Package for the Neighborhood to consider.
- Plan to provide the Waterford Neighborhood community an opportunity to view the packages for the stream restoration and dredging options.
The Final Combined Design Package:
The Final Combined Design Package:
FinalCombinedDesignPackage.pdf