Fall Design Package

Final Design Package Materials:

SECTION A:

  • Shop drawings for the construction of a trash collector for the incoming stream and screens to protect the pump intakes in the pond.

SECTION B:

  • Cost Estimate For The components Of The Trash Collector And Pump Intake Screens.

SECTION C:

  • GIS shapefile with water and sludge/sediment depths at different points in the pond.

SECTION D:

  • Hydrologic analysis, including estimates for amounts of incoming sediment.

PLAN FOR THE SPRING SEMESTER:

  • Timetable for implementation of the trash collector into the mouth of the stream.
  • How the performance of the trash collector will be measured.
  • Timetable for implementation of the pump screens into the pond.
  • How the performance of the pump screens will be measured.
  • Dredging Package for the Neighborhood to consider.
  • Stream Restoration Package for the Neighborhood to consider.
  • Plan to provide the Waterford Neighborhood community an opportunity to view the packages for the stream restoration and dredging options.

The Final Combined Design Package:

FinalCombinedDesignPackage.pdf