The attached ablution and washing buildings are decrepit and require a complete renovation. The shower area is open and lacks basic facilities for modesty. The toilets do not have doors. There are no sinks or mirrors. The cement floors are rough and water does not drain away.
The clothes washing area (6.75mtr x 1.5mtr) needs stainless steel wash troughs and cement floor installed.
There is overcrowding in the dormitories which requires the extension of dormitory #3
Recommendations:
The ablution block at the end of Dormitory #1 requires building (3.33mtr x 6.5) as it was not completed at the time of construction. The ablution block attached to Dormitory #2 requires extensive renovations.
· All dorms require guttering and stormwater down pipes
· External toilet block: Tiling and sloping of floors / install shower alcoves / install toilet doors
· In the toilet and shower facilities adjoining dormitory #2, the walls need replacing and floors tiled / shower alcoves installed / toilet doors installed / plumbing replaced inc shower heads
· Install water tank and plumb to toilets and showers
· Extend dormitory #3 by adding 13.8mtr x 6.6mtr.
· Install toilet and shower facilities at the end of dormitory #1