Work in progress. Last update 01.05.26
Ensure x1 green tick (top left corner and it's tiny!) and x2 green circles (middle of screen)
Ensure the following are connected:
1) Power cable: power source <-> CCE
2) DA cable (monitor): device <-> DA unit on anaesthetic machine <-> CCE
3) DA cable (ventilator): device <-> DA unit on anaesthetic machine <-> CCE
4) Ethernet: wall port (labelled as Cerner) <-> CCE
Switch off and on using this button (takes ~5 min to reboot)
Glossary
BMDI = Bedside Medical Device Integration - the process of automatically uploading clinical data to the patient's record
CCE = Cerner Connectivity Engine - black panel where connected devices are displayed (acts a device hub where all data enters/exits from)
DA = Device Adapter - the hardware connection between the device and the CCE (example in photo below)
Data flow is vulnerable to disruption at any one of these points.