I hiked up to Enzan-so during a long weekend off my Japanese studies, hoping to reach Tsubakuro Peak. This was my second time on this route. The first was in September 2023 during the Panorama Ginza Route, under much gentler conditions.
Overnight snow changed the plan completely. It was freezing cold camping on snow, and with safety in mind, I decided not to push on to the peak as I left my microspikes in the hotel. Instead, I hiked back down the next day and camped at Nakabusa. No summit this time, but a good reminder that knowing when to turn back is also part of the journey.
🌐 Trail information: The Japan Alps
🗺️ Map: Yamap
🌦️ Weather check: Tenkura Tsubakuro
🪪 Permits & Regulations: N.A.
🟢 Trailhead (Start Point): Nakabusa Onsen
🔴 Trail End (Finish Point): Nakabusa Onsen
📍 Access: Route bus from Hotaka Station (Fare: JPY 1,500 yen one-way) Refer to Nakabusa timetable
Date: 1 November 2025
Duration: 03:45
Start: 09:07 / End: 13:20
Camp: Enzan-sō 燕山荘 (Camp fee: 2,000 yen)
Date: 2 November 2025
Duration: 03:00
Start: 09:00 / End: 12:23
Camp: Nakabusa Onsen (Camp fee: 2,000 yen)
Backpack 40L
Rain cover
Plastic liner
Tent
Sleeping pad
Camp pillow
Sleeping quilt
Reflective sheet
Day bag 10L
Rain jacket
Rain pants
Down jacket
Fleece jacket
Neck gaiters
Base top
Base pants
Sleep socks
Quick dry towel
Fleece gloves
Cook stove
Cook pot
Spork
Filter 600ml
Lighter
Gas
Bandana
Toothbrush
Toothpaste
Comb
BB cream
Powder
Toilet paper
Bidet
Headlamp
Powerbank 10000mAH x 2
Cables: USB C, Micro, Garmin
Insta 360 & accessories
First aid & medicine kit
Lip balm
Bear bell
Whistle
Swiss Army knife
Thermal flask 300ml
Water bottle 500ml
Wallet & Passport
Cap
Sunglasses
Tee-shirt
Hiking pants
Gaiters
Toe socks
Handkerchief
Hiking shoes
Hiking poles