Project Management Specialist
PHASE I
PHASE II
This shows the outside of the roll-up door and the picture to the right shows the same door from the inside of the booth.
The paint booth will be for the student tool room. They will walk in the door shown above and the staff door is shown below.
PHASE III
Original location
Installed in booth
This metal grate on the floor (shown above) was replaced with a solid metal sheet (shown below).
PHASE III
After
PHASE III
After