Project Management Specialist
My primary objective for this project was to empty the entire building.
What does that really mean?
Inside the building:
Two classrooms and a computer lab had been used by another program on campus, since the rooms were in the building, I needed to empty them
The automotive program has a tool room along with a computer lab that the entire program utilizes
3 shop classrooms and 3 shops
The South Seattle College images shown highlight the buildings that were included in this project.
Automotive Building (shown as AUT)
First, let me show the outside, everything must be removed prior to construction.
For simplicity, I broke the 3 shops into Engines (blue), Electrical (red), Tool Room, Transmissions (yellowish/green)