Project Management Specialist
ABR to the left PHASE III
ABRC & ABRD are the two containers that sit on the northeast corner outside the ABR building.
Even with the an entire building, a portion of a second building, then a third building to move the instructors into temporarily, that was not enough space for what we would be moving over during the renovation.
North side of ABR Summer 2019 PHASE I
Campus services had a container on campus that we could use. They prepared and moved the first container over and I labeled it ABRC. This was placed outside of the ABR building on the northeast corner. The container has only one door which is at the east end so it would not have easy in/out access for equipment.
When I set-up the inventory, I created three storage categories:
STOR1 - means the item is used daily
STOR2 - means the item is used quarterly
STOR3 - means the item is will not be needed until they move back into the automotive building and is not needed temporarily. There was only a few of these items, and they needed to be stored.
This container is perfect for those items. They were moved in first and placed in the back of this container.
The second container we needed to purchase. We were able to get one with a roll-up side door for easier access. I had them place that one right next to the existing container.
I had never seen a container dropped off like this.
Perfect delivery!
The two doors is perfect for our needing to be able to get in/out on regular basis.