48 solar panels on our roof have been in operation since 16 Oct 2024. More reduction of carbon dioxide produced in generating electricity by the Hongkong Electric Company Limited is expected.
24 solar panels on our roof have been in operation since 3 Aug 2023. The purpose of joining this scheme is to reduce the carbon dioxide produced in generating electricity by the Hongkong Electric Company Limited. The electrical energy generated is delivered to the power grid on Hong Kong Island. The operation is monitored by a website which is shown shown in the TV outside our Staff Room.