We down-cycled our PET plastics collected to made this wardrobe which is placed next to the plastic recycling bins.
FiT Scheme Phase 2
48 solar panels were installed on our roof. The generation of electricity began on 16 Oct 2024.
The Phase 1 project was completed on 21 Sep 2023. The Phase 2 project was commenced from May 2024. Energy saving facilities such as LED lighting and Grade 1 air-conditioners will be replaced in the coming 5 years.
The new Green Wall is located at the Central Staircase
Please click the link above for more information on the harness of solar energy.
Solar Panels (Phase 1)
Water saving device is installed by the Water Supplies Department
Grow something
LED lighting
Solar Window Films
Motion Sensors at lift lobbies
Organic farming at the roof
Compost
Motion sensor operated water taps
Area for growing flowers
Dual Flushing Cistern
IoT Expansion board at OpenMaker Space
IoT Expansion board in classroom
Glass atomized curtain in the door of STEAM Room
Green Wall 1
Solar panels
LED lights with timer control
Vegetable bed in Aquaponics system
Aspara™ hydroponic smart grower
Rack for growing plants
Area for organic farming
Bicycle Parking Area
Snake Plants
Recycle bins for plastics
Ink Cartridge recycle box
Rechargeable batteries recycle box
Plastic lids collection box
Hand Sanitizer Machine
Non-contact thermometer
Green Corner in school library
Water Dispenser
Timer switch
Air Cleaner
Automatic control of toilet light & fan
Green Area 1
Green Area 2
Air-conditioners (Grade 1 or 2)
Flow Controllers in toilets
Recycle bins in pantry
Recycle bin in staff room
Energy saving lights with sensors
Recycle boxes in classrooms
Blinds in all rooms
3-colour Recycle Bins 1
3-colour Recycle Bins 2
Dehumidifier