While contracted by Senergy Econnect, Peter Engineering Group prepared an Interconnection Request for a client to submit a proposal to PG&E in response to their Request for Proposals for Solar PV generation. The necessary data and information was collected for the 20MW Solar PV proposed site, and Peter Engineering Group put together the proposal and submitted the proposal to PG&E on-time and on-budget. Dr. William Peter has extensive experience in preparing such proposals, interconnection requests, and Interconnection Agreements (LGIA and SGIA), as well as experiencing attending scoping meetings and System Impact Studies (Phase I and Phase II) results meetings.