Standing just inside the entrance, facing west across the lobby.
The meeting room will be to the left and main library to the right.
Standing in the lobby, facing north.
New and seasonal items and our Library of Things collection will be on the left.
Restrooms will be on the right.
The large opening on the left side will be a window and door in the adult room. There will be comfortable seating in this area. A study carrel will be built into the window on the eastern wall.
This is a view of the children's room.
Standing in the adult room, facing the entrance. Books stacks will line the wall on the right. Notice the Douglas Fir decking and beams that make up the ceiling.
Installation of rafters that will support an upturned roof over the entrance and the teen room is complete. Installation of an Air and Vapor Barrier on the exterior of the building will be complete soon.
The first window has been installed. This is in the staff workroom on the eastern side of the building.
An exterior view of the north facing window in the staff workroom.
The windows at the north end of the building, where the children's room will be located, are nearly complete.
An interior view of the north wall in the children's room, with windows and door in place.
The windows in the north wall, where the children's room will be located, are now fully installed.
Upturned roof over the entrance and the teen room.
The restrooms! :)
The teen room.
The Community Meeting Room
A large window on the north wall of the adult reading room.
The study carrel is starting to take shape on the west wall.
A view from the circulation desk area, looking toward the adult reading room and then the children's room.
From the lobby, looking north.
Looking at the entrance from the south end of the building.