rgy1.0 Title <dd:km kc:cdidtitle> Integrated Systems & Equipment List ( ISEL)
2.0 Purpose <dd:km kc:cdidpurpose>
This is a top down breakdown of a project from its highest "system" level to "sub-systems", "assemblies", "equipment", and on down to "parts".
It also dilineates the boundaries between systems in some cases.
3.0 Usage <dd:km kc:cdidusage>
It can also double as a "parts list" and a "Bill of Materials" and even replace a WBS if needs be.
4 Frequency <dd:km kc:cdidfreq>
5 Reference Documents <dd:km kc:cdidrefs>
6 Responsibility <dd:km kc:resp>
7 Ownership <dd:km kc:cdidowner>
8 Level of Effort <dd:km kc:cdidloe>
9 Risks <dd:km kc:cdidrisk>
10 Contents <dd:km kc:cdiditems>
10.1 Tag no
10.2 Part name
10.3 parent tag no
10.4 part data sheet URL**
10.5 part status
10.6 part version number
10.7 part version number date
11 XML <dd:km kc:???>
12 File Handling Policy <dd:km kc:cdid???>