Post date: Jun 30, 2014 5:41:1 AM
Modified:08-Jan-2014
Type:PROBLEM
Oracle General Ledger - Version 11.5.10.2 to 12.1 [Release 11.5.10 to 12.1]
Information in this document applies to any platform.
Program: RGRARG - Financial Statement Generator (FSG)
Budgets amounts do not appear on the FSG report output.
A Control Value number was not assigned to the budget column in the FSG Column Set Definition.
Since Oracle GL allows you to define multiple budgets you must indicate what budget you want displayed in the row or column. You do this by first assigning a Control Value in the Balance Control section of the Row or Column window. The control value is any numeric value. Next, you must tell FSG what budget relates to the Control Value. You do this in the Define Report form. When you define a control value for either your Row Set or Column Set in your report, the Control Value button will be activated. By selecting the Control Value button you can assign budgets to your control values. 1) Verify that a Control Value number is defined for each Budget column. The Navigation Path is: Reports> Define> Column Set 2) Check that the required Budget has been assigned to each Control Value in the Report Definition. The Navigation Path is: Reports> Define> Report