Open APEX and insert the EDS detector.
Select your project and name your sample.
Minimize the chamberscope (Camera.)
Select a voltage that supplies enough energy for the elements in your specimen.
Use a periodic table like this one
Select a probe current so the Dead Time (DT) reads between 20-40%.
Adjust the image settings as needed.
Capture an image.
Select the mode and define the area.
Select the quality.
Start the scan.
Label the peaks and adjust the background.
Generate and save a report.