PHASING PLAN
SITE LAYOUT:
Site access:
To make drop-off and pick-up less crowded, a special building entrance will be made away from the main school entrances.
During the job, clear signs will show workers and construction trucks the right way to go.
Working with the school to set up pre-approved supply plans will cut down on interruptions during school hours.
Site Security:
A temporary, strong fence or barrier system will be put up around the work site to keep people from getting in when it's not in use.
A secure check-in/check-out system will be available to all building workers and guests. This will help track who is on-site and make the whole place safer.
After a full security check, extra steps like having security guards on-site or placing video cameras in key places may be taken to make things safer.
Vehicle Routes:
Dedicated building car paths will try to avoid areas with lots of people walking, like playgrounds and drop-off/pick-up zones for students. Putting up safety cones, temporary walls, and the right signs will make walking safer.
We will work with the local government to get permits for building vehicles and make sure they stay on routes that have already been cleared and don't get in the way of school buses or public roads.
PHASE 1
Site Preparation
Demolition of existing trees.
Soil testing.
Site clearing and excavation.
PHASE 2
Foundation Construction
Foundation construction.
Utility installation.
Foundations completed, and ready for above-ground work.
PHASE 3
Building Erection:
Framing of walls and roof.
Installation of windows and doors.
Exterior sheathing and waterproofing.
PHASE 4
Exterior Finishes
Roofing installation.
Siding application.
Exterior trim and finishes, gutters, and downspouts installed.
Interior Finishes
Drywall installation.
Flooring, ceilings, and trim installation.
Painting and final interior finishes.
PHASE 5
Sitework and Inspections
Paving of walkways and parking lots.
Installation of exterior amenities such as fences, patios, and signage.
Final inspections by various authorities.