Solar install labor is:
Mostly skilled manual work
Split between roof and electrical crews
Highly dependent on prep quality
Completed in 1–2 days for most homes
SOLAR INSTALL BASICS
ENPHASE
Best Practices
AI Wire Check
4th Gen Commissioning
6C Combiner
6C Wiring
10C Install
10C Commissioning
PEGASUS
Pegasus Rail combines next-level efficiency with elegance and a lifetime of durability.
TESLA
Inverter
Inverter Tech Brief
Gateway 3
Gateway 3 Wiring
Powerwall Overview
Powerwall 3 Install
Powerwall Wiring
Powerwall Commissioning
MISC ELECTRICAL
IQ Meter Collar Install
Backup Switch
IQ Meter Collar Intro
Utility IQ Meter Collar
10C Battery
Optional items for RSD devices, including a external two pole knife-blade disconnect, and three pole disconnect with AC sense wire for full system rapid shutdown.
SOLAR INSTALLATION FIELD CHECKLIST
☐ Final design reviewed (layout, attachments, electrical)
☐ Permit approved / install authorized
☐ Materials confirmed on truck (panels, rails, mounts, inverter, wire, breakers)
☐ Crew assigned (roof + electrician + lead)
☐ Safety plan reviewed (roof type, pitch, weather)
☐ Customer notified of arrival window
☐ Jobsite walk-through completed
☐ Ladder set and secured
☐ Fall protection installed (anchors, harnesses, ropes)
☐ PPE worn by all crew
☐ Main service disconnect located
☐ Roof condition verified vs plans
☐ Roof measured and verified
☐ Chalk lines snapped for rail alignment
☐ Rafters/trusses located and marked
☐ Setbacks and fire code clearances confirmed
☐ Layout matches approved plan
☐ Pilot holes drilled correctly
☐ Lag bolts / standoffs installed into structure
☐ Flashing installed at every penetration
☐ Sealant applied properly
☐ Mounts torqued to manufacturer spec
☐ Waterproofing visually verified
☐ Rails installed on all mounts
☐ Rails leveled and squared
☐ Rail splices secured
☐ Rail bonding hardware installed
☐ Grounding path verified
☐ Panels inspected for damage
☐ Panels safely lifted to roof
☐ Panels staged near install rows
☐ Packaging removed and staged for cleanup
☐ Panels mounted in correct positions
☐ Mid/end clamps installed and torqued
☐ Microinverters/optimizers installed (if applicable)
☐ Module-to-module wiring completed
☐ Wire management secured (clips, ties)
☐ Drip loops installed where required
☐ Inverter(s) mounted securely
☐ DC disconnect installed
☐ AC disconnect installed
☐ Conduit run from roof to inverter
☐ Conduit secured and supported
☐ System tied into main service panel
☐ Breakers installed and labeled
☐ Equipment grounding conductor installed
☐ Bonding jumpers installed where required
☐ All metallic components bonded
☐ Ground continuity verified
☐ All bolts and clamps torque-checked
☐ Roof penetrations re-inspected
☐ Wire runs neat and protected
☐ Polarity checked
☐ Voltage checked
☐ Labels applied per NEC & utility rules
☐ Monitoring hardware installed/configured (if allowed)
☐ Roof cleared of tools and debris
☐ Ground area cleaned
☐ Packaging removed
☐ Landscaping undisturbed
☐ Final walk-through of site
☐ System overview explained to customer
☐ Safety shutoffs identified
☐ Next steps explained (inspection & PTO)
☐ Customer questions answered
☐ Photos taken for records
☐ Job marked “install complete”