Guidelines for Report
Weekly Progress Reports should be printed out before meetings with the sponsor and instructor.
All team members should be able to explain all items on the progress report.
To start a new progress report, create a new webpage and use the Progress Report Template.
Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Budget at UCSD is $500.00 ($279.15 already spent). Budget at SPAWAR is $5500 ($929.17 Spent)
Track type decided (snowmobile parts). Ordered all drive shafts, drive wheels, and track. Track and 1/2 of drive shafts/wheels arrived. Yet to order idler wheels. (Ryan)
Frame and chassis designs are being analyzed and are waiting from approval from sponsor. (Mike, Ryan, Edrees)
Tensioner requires redesign based on sponsor request. Springs and hardware Preliminary spring-force testing upcoming (awaiting parts to arrive). (Ryan)
Working on Controls and looking to have all software and packages installed and ready to go for the week (Edrees)
Work on the controls as much until the power cord is obtained. The segway still has some battery power, so work on sending commands. (Edrees)
Drive train gear ratio, sprocket sizes, and chain size determined. Awaiting ordering of needed parts. (Mahin)
Idler wheels need to be purchased based on which kind of idler wheel design sponsor suggests this week.
NEED A POWER CABLE. (email sent to aaron)
Accomplishments from Previous Week
Designed home page and updated Reports page. (Ed. Siddiqui)
Worked on controls and have a solution in mind to control segway (Edrees)
Worked on 2 more chassis designs (Mike)
Purchased drive wheels/drive shafts/tracks (Ryan)
Tensioner analysis (Ryan)
Chain Tensioner prototype parts purchased (John)
Motor shaft adapter redesigned (Mahin)
Researched idler wheels, raw frame materials, axle materials (Ryan)
Track tensioner redesigned from 4-bar to 1-bar (Ryan)
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Send orders for any remaining raw materials & COTS parts to Aaron at SPAWAR by 2/2/12 (All team members)
Website Updates/Construction (Ed)
Being able to send commands to Segway Robot. (Ed)
Receive sponsor approval for final design concepts, and begin fabrication (John, Ryan, Mike, Mahin, Ed.)
Cut tracks and begin spring force tests for track tensioner (Ryan, Ed)
Begin cutting aluminum and setting up the chassis to attach tracks. (all)
Work on building specific parts of the track system (all).
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments
Looking into making the center wheel attach to the front sprocket wheel.
Making more chassis designs in order to have more options for sponsor.
Learn to control the segway
Instructor Comments from Last Meeting and Actions Taken to Address these Comments
Look into order parts and start working!
Start doing machine work!
Perhaps look at double plated chassis.
Risks and Areas of Concern
Worried about loading and cyclic fatigue at connection points.
We need to start machining.
We need to decide on a design and start working to make the track conversion kit.
Time management and organized meetings needed!
Resources or Information Required but not Available
N/A
Schedule
Update Gantt chart.
Budget (list amount spent and amount remaining)
$6000 provided
$929.17 spent (Spawar Budget)
$279.15 spent (UCSD Budget)
remaining
Progress on Report and Webpage
Home and Reports pages reformatted and organized
Added links to sponsor and updated project management page (w/ video embedded)
Added links to budget forms and order forms.
Beginning report organization