Team 13 – Delta Design – Week 9 Progress Report
Inkyu Kim, Kyoung Kim, Youngjin Kim, Yule Kim
Overview of Status of Analysis, Design, Fabrication, Tests, etc.
· Waiting for parts to come for mixing box
· Perform test with testing chamber
Accomplishments from Previous Week
· Ordered more parts for mixing box
Goals for Next Week(list names after each item). Use specific and measurable objectives
· Begin fabricating box assembly (Everyone)
· Perform a test on the testing chamber (Yule Kim, Inkyu Kim)
· Obtain hoses for vacuum pump(Young Jin Kim)
· Interface LabVIEW with Arduino
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments
· Explained the control algorithm more thoroughly
Instructor Comments from Last Meeting and Actions Taken to Address these Comments
· Use three solenoid valves in the system so that in the case where the mixing chamber is not being used, the fluid can flow directly to the testing chamber.
Risks and Areas of Concern
· Mixing box fabrication needs to be finished this week
· Some parts are still being shipped
· Interfacing LabVIEW with Arduino
· Putting RTD in mixing chamber
Resources or information Required but not Available
· Parts are being shipped
Schedule
· Work on LabVIEW program
· Begin fabricating box assembly
Budget
· Spent: $1122.34
Progress on Report and Webpage
· Updated budget page
· Uploaded 2nd Report Draft
· Updated team webpage