Team 13 – Delta Design – Week 5 Progress Report
Inkyu Kim, Kyoung Kim, Youngjin Kim, Yule Kim
Overview of Status of Analysis, Design, Fabrication, Tests, etc.
· Fabricated mixing chamber(not welded yet) and testing chamber
· Connected all of the hoses
· Performed a test run of the whole system
· Performed an experiment with only LN2
Accomplishments from Previous Week
· Fabricated most of the testing chamber and mixing chamber(only need to weld mixing chamber and silicone seal mixing chamber)
· Performed a couple test runs
Goals for Next Week(list names after each item). Use specific and measurable objectives
· Weld the testing chamber(Young Jin Kim, Inkyu Kim)
· Get RTD to work properly - signal creates a lot of noise with stable current source(Everyone)
· Finish fabricating testing chamber – make a baffle, place DUT inside, seal(Kyoung Kim, Young Jin Kim, Inkyu Kim)
· Continue working on LabVIEW program (Everyone)
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments
· Clarified our goals – first, make temperature of the environment to -40°C
Instructor Comments from Last Meeting and Actions Taken to Address these Comments
· Meet with our sponsor to clarify our goals
Risks and Areas of Concern
· A lot of leaks in the system’s piping
Resources or information Required but not Available
· Flat plate heat exchanger calculations
Schedule
· Work on LabVIEW program
· Finish fabrication and fix leak problems
Budget
· Spent: $733.65
Progress on Report and Webpage
· Updated budget page
· Uploaded Report Draft