Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Fabrication and Testing
Accomplishments from Previous Week
Flow meter/pressure transducer
Documentation (Tim, Cameron)
Update code for new LCD, fan and pressure transducer. (Cameron)
Vacuum System
Buy 3 way valve and adapters for hoses and flow meters (Heja)
Report
Organize CAD drawings for report (Cameron)
Abstract (Heja)
Executive Summary (Heja)
Chapter 2: Description of Final Design Solution (Tim)
Final Design Solution with brief review of requirements (Tim)
Figures/Drawings (Cameron/Tim)
Chapter 3: Design of Key Components
Internal Frame (Scott)
CAD Figures (Cameron)
Fabric (Scott)
Flow meter/pressure transducer (Cameron)
CAD Figures
Chapter 4: Prototype Performance (Tim/Cameron)
Hold pressure test? Postpone until week 7.
Chapter 5: Design Recommendations and Conclusions (Tim)
Changes to zipper for production design
Format Report (Cameron/Heja)
Upload Report (Cameron)
Proof of Concept Presentation
Add Catenary simulation to proof of concept presentation (Scott)
Website
First draft of website (Cameron)
Home Page
Sponsors
"How it works" summary
Photos of current frame
List of Deliverables
Goals for Next Week (list names after each item). Use specific and measurable objectives.
In Progress / Done
Flow meter/pressure transducer
Calibrate pressure transducer (Cameron)
Create OP-Amp circuit (Cameron)
Integrate new circuit with Arduino (Cameron)
Sewing
Nylon strap mesh (Scott)
Neoprene seal (Scott)
Sew everything (Scott)
Moral Support (Everyone)
Material stress test with sewn fabric samples (Heja)
Frame
Cut two more support poles (Tim)
Cut notches in arches for extra poles (Heja)
Website
Report
Start poster (Heja)
Revise report from notes (Cameron, Tim)
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Spoke with sponsor about forces. Asked about distributing forces across internal frame and bed frame. We are adjusting the design to accommodate both a lower internal platform and also work with the lower design by redistributing forces around top of frame. The proposed redesign is very close to existing designs and sponsor would rather have our initial design built.
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Suggested adjustments to solid works FEA assumptions from fixed to simply supported. Updated analysis to match.
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
N/A
Risks and Areas of Concern
New forces on upper frame.
Resources or Information Required but not Available
Simulate/calculate strap forces distributed to frame.
Schedule
Finish sewing complete structure (5/15)
Update Gantt chart.
Budget (list amount spent and amount remaining)
$984.21 Spent
$4515.79 Remaining
Progress on Report and Webpage
First draft of report turned in
Updated website to match
Final poster started