Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Fabrication in progress
Test sewing of materials
Accomplishments from Previous Week
Machined inner structure.
Purchased vacuum system.
Early setup of flow and pressure meter system.
Goals for Next Week (list names after each item). Use specific and measurable objectives.
In Progress
Done
Flow meter/pressure transducer
Fan Code (Cameron)
LCD Code (Cameron)
Transducer code (Cameron)
Add USB data output (Cameron)
Circuit diagram (Cameron)
Documentation (Tim, Cameron)
Add to key components section of report (Tim)
Sewing
Nylon strap mesh (Scott)
Neoprene seal (Scott)
Attach zipper to vinyl (Scott)
Test anti-tear sewing methods (Scott)
Vacuum System
Buy 3 way valve and adapters for hoses and flow meters (Heja)
Design Alterations
Add long straps in locations that accommodate ICU bed. (All)
Hospital bed (Heja)
Contact Dr. Hargen's department one more time. (Heja)
Update: Contacted sponsor after discussion, they gave approval to buy a bed.
Else, visit surplus store. (Heja)
Make decision on bed by week 5
Buy bed and mattress from surplus store (Heja)
Report
Organize CAD drawings for report (Cameron)
CAD fabric? Talk to Pedro. (Cameron)
"Decision Justification" continue outline(Heja)
Standards (Tim, Heja)
Report 1st Draft
Analysis of end plates and poles FEA (Cameron)
Catenary analysis of nylon support structure (Scott)
Add Catenary simulation to proof of concept presentation (Scott)
Proof of concept presentation outline (Heja)
Website
First draft of website (Cameron)
Home Page
Sponsors
Update background
Update objectives
"How it works" summary
Photos of current frame
List of Deliverables
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Showed sponsor professor's bed, sponsor would rather buy an ICU style bed from a surplus store. (4/21, In person)
Other sponsor has one more contact to check with before we buy a bed. (4/22, email)
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Has a home style bed. We will bring bed photos to sponsor meeting.
Instructor would like to see a different support structure.
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
Recruited other students in making force assumptions and diagrams for dynamics of system on bed.
Risks and Areas of Concern
Forces on bed.
Rough calculations 5 straps
10deg angle each strap holds 800lb
15deg angle each strap holds 500lb
Resources or Information Required but not Available
Schedule
Finish sewing structure (5/5)
Write applicable standards section of report (4/28)
Receive
Update Gantt chart.
Budget (list amount spent and amount remaining)
$869 Spent
$4631 Remaining
Progress on Report and Webpage
Revised all existing sections.
Wrote impact on society.
Wrote applicable standards