Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Frame
Will be entirely constructed out of welded Stainless Steel
Trigger for Foot Mechanism
Will be 3D printed hook release
Foot Hook
Brainstorming replacement mechanism that is safer, easier to use, and more efficient
Optimize for either Jon Boat or Kayak
Meeting with Sponsor on Friday, will clarify which to optimize for
Accomplishments from Previous Week
Stainless Steel Frame
Ordered stainless steel (Justin/Isabel)
Cut out stainless steel pieces for hard stop in process of welding (Justin/Denny)
Trigger for Foot Mechanism
3D printed hook prototype for release (Joshua)
Camera Attachment onto pole/sampler
Looking over best options for mounting camera onto sampler-pole setup (Caitlin)
Go Pro Mounts
Look over report first draft feedback
Abstract (Isabel)
Table of Contents (All)
List of Figures (All)
List of Tables (All)
Chapter 1: Project Description (Isabel)
Chapter 2: Description of Final Design Solution (Justin)
Chapter 3: Design of Key Components (Denny)
Chapter 4: Prototype Performance (Joshua)
Chapter 5: Design Recommendations and Conclusions (Caitlin)
Acknowledgments (All)
References (All)
Appendices (All)
Improve Team Webpage (All)
Discuss Intermediate Team Review (All)
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Stainless Steel Frame
Finish up welding stainless steel parts for hard stop as well as the other parts of the frame (Justin/Denny)
Trigger for Foot Mechanism
Implement hook release prototype (Joshua/Isabel)
Camera Attachment onto pole/sampler
Determine best mount and mount onto pole/sampler (Caitlin)
Second Draft of Report due on Friday 5/19 by Midnight
Abstract (Isabel)
Table of Contents (All)
List of Figures (All)
List of Tables (All)
Chapter 1: Project Description (Isabel)
Chapter 2: Description of Final Design Solution (Justin)
Chapter 3: Design of Key Components (Denny)
Chapter 4: Prototype Performance (Joshua)
Chapter 5: Design Recommendations and Conclusions (Caitlin)
Acknowledgments (All)
References (All)
Appendices (All)
Improve Team Webpage (All)
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Sponsor Stated that a jon boat might be used instead of kayak 5/1
Ask Sponsor to decide on one so that team can optimize project
Sponsor Stated that testing will most likely occur with teams of two people 5/1
Stated that there will always be two researchers aiding each other on the field
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Report is unclear (5/10)
Explain what we are doing vs what the sponsor is giving us
Clarify that we are only dealing with the pole and trigger
Clarify that the sampler is obtained
Commercial off the shelf (COTS)
Parts are missing
Need annotated figures
Final design is short
Need to be in metric units
English units can be included in parentheses
Past Tense
Trigger Mechanism is a bit iffy (5/10)
Test to ensure it doesn't slip
Cable pulling at angle of 30 degrees
The hing will carry the weight
Spring Stiffness is a lot
Hook for Foot is dangerous (5/10)
Talk to the manufacturer about possible changes
Quick Release Latches and Barrel Releases
Suggestions/Needs
FBD
Animation of entire device
Talk to manufacturer about rating of spring
Top spring might pinch and doesn't seem permanent
Needs to be designed for use and re-use
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
N/A
Risks and Areas of Concern
Foot Hook needs a replacement
Time is ticking and team has not thought of viable replacement
Resources or Information Required but not Available
N/A
Schedule
Improving Prototype for the next two weeks with addition of some key mechanisms
Foot Trigger Mechanism
Pole Attachment and 0.1 meter hard stop
Camera Attachment to Pole
Next Draft of Report/Website due Friday, 5/19
Update Gantt chart.
Budget (list amount spent and amount remaining)
$320.70 spent, $679.30 remaining
Progress on Report and Webpage
Project Management up to Week 7 complete on webpage by 5/17
First draft of Report/Website completed by 5/5