Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Final Design
Fabricated
Last Field Test
6/6, Sponsors generally content
Accomplishments from Previous Week
Camera Attachment onto pole/sampler (All)
Implement Camera mount
Ball Loss Prevention Feature (All)
Attach Swivel Hoist Ring to Ball
Add Hook to Sampler
Connect String/Cable to Swivel Hoist Ring and Hook on Sampler
Spacers for Frame
CAD-(Denny)
Machining-(Justin/Joshua)
Work on Final Report/Website Due 6/9 (All)
Draft Poster Final Draft 6/9 (All)
Final Design Review at Sponsors 6/8 (All)
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Make small quality edits to Final Report/Website/Draft Poster by 6/15 (All)
Buy/Machine deliverables for sponsors by 6/15 (All)
Final Peer Review due by 6/12 (All)
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Deliverables 6/8
Enough bolts, nuts, rope, shackles, etc to be able to assemble another two samplers
2 extra camera batteries
Device 6/8
Will require more testing to see what will need to be modified in the future
Future recommendations
Longer rod to lax spring tension when needed
More anti-catching parts for the rope/pole on the arm release mechanism
More universal frame for other kayaks
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Frame 6/5
Reinforce with stainless steel angle brackets (Reinforcement angle brackets were welded by Tom 6/13)
Camera 6/5
Must mount (Mounts were machined and cameras are mounted 6/7)
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
N/A
Risks and Areas of Concern
N/A
Resources or Information Required but not Available
N/A
Schedule
Deliverables/Poster Session on 6/15
Final Report/Poster/Website edits by 6/15
Update Gantt chart.
Budget (list amount spent and amount remaining)
$924.68 spent, $75.32 remaining
Progress on Report and Webpage
Project Management up to Finals Week complete by 6/14
Final Report/Poster/Website complete as of 6/10
Requires small edits