Week 3 Progress Report
Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Prototype linkage assembly completed
Finalizing float test
Completed second revision of full jellyfish assembly
Accomplishments from Previous Week
Modeled for printing the fin-ray effect to transfer motion to tentacles (Michael)
Researched dynamic seals to waterproof actuator: Rotational motion or a bellows (Trevor)
Made decision on battery to use (Ciara)
Ordered battery (Damian)
Completed version of full jellyfish CAD assembly (Ciara)
Researched battery charger (Damian)
Printed & assembled complete linkage assembly (Damian)
Modeled equations for electromagnetic actuation (Trevor)
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Model housing setup (we want prototype ready to be printed) (stretch)(Ciara)
Consult Tom or Ian about construction float and temperature test (Damian)
Test tentacle prototype (Damian leads others will help/be there)
Verify tentacle’s full-size/how it will fit together (Michael)
Reassess Gantt Chart and update (Trevor)
Test actuation temperature (Damian leads and others will help/be there)
Order or borrow Li-po battery charger (Damian)
Order the camera (Damian)
Start looking into the coding camera with openCV (Everyone)
Familiarize with RaPi and develop presentation for rest of team (Everyone)
Print tentacles (Michael)
Build an electromagnet or Look into buying one (Trevor)
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Try to make it as small as possible (can we make the dome smaller?)
Worried about sealing the actuator from its surroundings
Wants tentacles to be flexibly attached (no rotating joint)
Make integration of optical equipment easy if possible
Wasn’t very keen on electromagnetic actuation
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Look into flexure joints
Look into electromagnetic actuation
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
Environmental impact of materials in design (4/4/2016)
Keeping knowledge of absolute angle quaternions or euler angles (4/4/2016)
Risks and Areas of Concern
Air-Water interface/sealing technique (& its longevity)
Resources or Information Required but not Available
Pool access/swimwear
Food
Schedule
Upcoming Milestones:
Design Test/Proof of Concept
Budget (list amount spent and amount remaining)
Total Spent: $239 Total Remaining: $2,261
Battery - $60
Progress on Report and Webpage
Did required report sections
Updated appropriate sections with new information/files