Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Finalized proposed electrical design
Printed full size prototype linkage
Completed initial tentacle CAD design
Accomplishments from Previous Week
Completed individual component analysis
Materials selection and waterproofing (Trevor)
Analysis of drag, buoyancy and pressure in regards to tentacles (Michael)
Heat transfer and power consumption (Ciara)
Actuator/Linkage analysis & prototyping (Damian)
Created Design Proposal Presentation (All)
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Check schematic with Steve Roberts (Ciara)
Order main components (Damian)
Finalize actuation waterproofing method (Trevor)
Complete tentacle prototype (Michael)
Start housing CAD design (Ciara & Damian)
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Same as last week
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Examine heat issues with shape memory alloy (3/30/16)
Re-examined Miga Motor datasheet
Explore electromagnetic coupling (3/30/16)
Continued research on additional designs
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
More pictures less text for slides in presentations (risk reduction comments - 3/15)
Concerns about steering capabilities (risk reduction comments -3/15)
Not enough prototypes made (risk reduction comments - 3/15)
Risks and Areas of Concern
Designing propulsion mechanism test
Diving technique/abilities
Resources or Information Required but not Available
None
Schedule
Upcoming milestones:
Electrical Schematic - 4/6/16
Initial design already completed
Review with Steve Roberts
Tentacle Design Decision - 4/9/2016
Covered bell vs individual tentacles
One way flow method
Actuation Waterproofing Method - 4/10/2016
Flexible housing
Electromagnetic coupling
Housing Layout - 4/24/2016
Mounting locations
Steering mechanism
Budget (list amount spent and amount remaining)
$179.08 spent
$2320.92 remaining
~$250 more planned to be spent
Progress on Report and Webpage
Uploaded individual component analysis
Uploaded CAD files