Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Pushing to have good documentation and get the jellyfish working better
The jellyfish has close to neutral buoyancy
Accomplishments from Previous Week
Wrote multithreaded code to run propulsion and steering (Michael)
Bought brass weights (Damian)
Created tentacles out of gasket material and shim stock (Damian and Michael)
Machined steering weights and delrin spacer (Trevor)
Tested propulsion ability (All)
Checked complete assembly’s buoyancy/weight and adjusted accordingly (All)
Fixed issue allowing us to ssh over wifi (most likely problematic b/c UCSD wifi) (Michael)
Printed and sanded steering gear and spacer (Damian)
Completed draft of poster (Ciara)
Prepared final sponsor presentation (Ciara)
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Work on documentation
User manual (Ciara)
Assembly drawings/BOM (Ciara)
Final report/website/poster (All)
Present the final design to Jules on Saturday (All)
Write code to get video working at the same time as propulsion (Michael)
Solder connections to RPi s.t. the camera will fit in (current connectors are too tall) (Michael)
Make the jellyfish neutrally buoyant (All)
Find out volume displaced by auv (Trevor)
Iterate through different amounts of weight
Work on making the propulsion work (All)
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
(in-person 5/24/2016) Not worried about report, get it working then the report...get it to swim
Focused on testing propulsion over the weekend
(in-person 5/31/2016) Is the camera running?
We have it able to run, but not at the same time as the motors. Working on this now.
(in-person 5/31/2016) What will be on the poster? How about a design tree or visual representation of the process?
Talk about adding a design tree w/ Dr. T and Pedro
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Can you test with the dome open?
Fixed ssh/WIFI problem to avoid making this necessary
Do the buoyancy changing on the outside
Attached weights to the tentacles
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
Khoa (in-person 5/29/2016) - may want to have a rigid part to the rope actuation to help push on the back stroke.
Will pursue if other options fail
Risks and Areas of Concern
Steering ability
Propulsion power to move
Focus is on project outcome, not report/webpage (running out of time to make high quality ones)
Buoyancy
Ability to implement and test controls, ability to orient itself properly
Resources or Information Required but not Available
None
Schedule
Sat: final design review at sponsor’s location
Thurs/Fri: final documentation creation - report, website, and product manual
Wed/Thurs/Fri: test propulsion improvements
Budget (list amount spent and amount remaining)
Spent: $1082.03 Remaining: $1417.97
Purchased this week: hardware, $12.25
Progress on Report and Webpage
Amending report with corrections from Team 1
Webpage updated with poster graphics