156B Week 8
Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Need to test Camera with mounts.
We have access to a shaker table and will meet with Chris Cassidy for an overview.
Fabrication of the Housing
Cutting
Welding
Machining
Test of camera in housing by shoving into sand.
Need to test camera on a computer, ensure software will not be a problem
Accomplishments from Previous Week
Ordered: spring steel, anti-fog window cleaner............................................................................Vicki
Checked with JV for arrival of components..................................................................................Curtis
Tested the camera....................................................................................................................Juan and Jonathan
Placed the camera in a cardboard box to find lighting needed, best focal length, and minimum mirror size requirements
Tinkered with the camera software to better understand the parameters of the camera
Designed a mount for the mirror.................................................................................................Curtis
Created an aluminum window attachment to check if it will successfully hold the camera...............Juan
Finalized dimensions of housing components:
Mounts: dimensions of spring steel..................................................................................Vicki
Housing shell dimensions................................................................................................Juan
Housing lid dimensions....................................................................................................Curtis
Distance between window and camera dimensions.............................................................Jonathan
Find initial droop of camera and analyze vibrations with this as the equilibrium point.........................Vicki
Complete final draft presentation..................................................................................................All
Edit first draft of final report..........................................................................................................All
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Start machining/welding:
housing shell............................................................................................................. Curtis
window attachment.....................................................................................................Juan
lid..............................................................................................................................Jonathan
spring steel.................................................................................................................Vicki
Write up second draft report....................................................................................................ALL
Add to the webpage...............................................................................................................ALL
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Check if deviation caused by the wedge will be an issue
emailed professor Ford and Elgamal
Created a second design of a wedged tip that eliminates deviation
Test lighting
Tested the lighting needed for the camera to obtain a good image
Find out where to place the camera
Experimentally found the best position for the camera
Test the camera software
Tested and better understood Python 4 Software
Took a video for Dr. Oiler to see and check if the image is good enough
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Create a CAD model of the final design (with everything put together)
Test the camera software
Tested and better understood Python 4 Software
Finalize placement of components
Make sure that there is enough lighting for the camera to take images
Emailed Professor Ford with questions about optics issues
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
Risks and Areas of Concern
Time for machining and putting together everything
Testing the prototype in similar conditions to its deployment conditions
Resources or Information Required but not Available
Schedule
Describe upcoming milestone
Update Gantt chart.
Budget (list amount spent and amount remaining)
Pending:
Lighting
Sealing epoxy for splice connection
Camera
Lens
Rubber stoppers
Progress on Report and Webpage
Corrected first draft
Adding things for second draft