*156B Week 10
Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Rapid redsign of interior mounts has been completed.
Fabrication is still underweigh and scheduled to finish early this week
Testing will be completed by Wednesday
Analysis and completion of report and wepage by the end of the week.
Accomplishments from Previous Week
Redesign of the Camera and Mirror mounting scheme..........................................................ALL
Cage design ..............................................................................................................Vicki, Juan, Curtis
All attached to the lid and removable
Easily adjust height of the camera and mirror
Allow for replacement of components
Attach lighting to cage with heat sink brackets.......................................................................Jonathan
With lead wires and resistors.......................................................................................Curtis
Power source...............................................................................................................Curtis
Welded Top insert into the housing and complete machining of the insert............................Jonathan, Curtis
Place center points into bottom insert..........................................................................Curtis
Widen top insert diameter to fit lid..........................................................................................Jonathan, Curtis
Secure Wetmate to Lid, tap hole for bulkhead connector.......................................................Curtis
Locate and complete rods.......................................................................................................Curtis
Machine Aluminum cage rings................................................................................................Curtis
Drill out holes in cage rings.....................................................................................................Jonathan
Cut corners out, drill holes, and tap them for set screws........................................................Vicki
3d print cage rings for mounting the mirror.............................................................................Juan
Finish cage rings with set screws...........................................................................................Juan
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Weld bottom insert into housing.............................................................................................Curtis (Tom)
Weld side insert into housing.................................................................................................Curtis (Tom)
Splice Wetmate to Ethernet cable (next week)......................................................................Juan
Complete Camera mounts.....................................................................................................Vicki
Test camera mounts on shaker table with equivalent mass...................................................Vicki, Curtis
Determine positions of all internal components.....................................................................Juan
Complete lighting mounts.......................................................................................................Jonathan
Test housing and lighting.......................................................................................................Jonathan, Juan
Test complete project on shaker table...................................................................................ALL
Test Complete project in sand, manual drive.........................................................................ALL
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Instructors agreed that our design was too risky, and recommended a rapid redesign of the interior of the housing.
Team completed an interior redesigning effort and completed CAD files to start production of new parts within 24 hours.
James Babcock commented on the mirror and recommonded that we cut the mirror if needed, any glass shop should be able to cut the glass.
Team will contact a nearby glas shop to adjust the mirror dimensions, we will take care to advise the shop it is a first surface mirror.
Received report with peer evaluation and comments
Team will consider the feedback and adjust the final report accordingly.
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
Risks and Areas of Concern
Resources or Information Required but not Available
Schedule
Describe upcoming milestone
Completing of housing exterior
Begining of testing
Complettion of the project.
Update Gantt chart.
Budget (list amount spent and amount remaining)
Progress on Report and Webpage